Explosion protection measures for condensing evaporators (air separation equipment)

2008-01-23View Original

Thread Content

Explosion prevention measures for condensation evaporators (air separation equipment): According to incomplete statistics, at the end of the 1970s and the beginning of the 1980s, there were over 30 explosions involving large and medium-sized air separation equipment in China, as well as over 100 explosions involving smaller units. Starting from the mid-1990s, explosions of the condensation evaporators (hereinafter referred to as main coolers) in large-scale air separation equipment occurred repeatedly both domestically and internationally, resulting in severe losses. In 1996, an explosion occurred in the 6000 m3/h main cooler at Liaoning Shunyiethylene Chemical Company, damaging the air separation tower and resulting in 4 deaths ; In 1997, an explosion occurred in the 80,000 m3/h air separation main cooler at Petronas Shell Oil Company in Malaysia, destroying the entire air separation equipment and injuring 12 people. It can be seen that main cooling explosion protection is key to the safety of air separation equipment. I. Mechanism of primary cooling explosion 1. Hazardous substances a. Flammable components: mainly hydrocarbons such as acetylene; acetylene is the most hazardous, with a very low solubility in liquid oxygen (5.6×10-6 mg/L), allowing it to precipitate in solid form easily and trigger an explosion. b. Clogging components: mainly carbon dioxide, moisture, and nitrous oxide; in particular, nitrous oxide is attracting increasing attention. When these substances crystallize and precipitate, they block the main cooling channels, leading to \"dry evaporation\" and \"dead-end boiling\" in the main cooler. This results in the concentration, accumulation, and precipitation of hydrocarbons, which can trigger an explosion in the main cooler. c. Strong oxidizers: Liquid chlorine is a strong oxidizer. 2. Several initiation factors a. Mechanical impact initiation by solid impurity particles (friction of acetylene particles, shock from liquid oxygen). b. Static electricity: When carbon dioxide particles reach (200–300)×104 ppm, static electricity can be generated, with a voltage of up to 3 kV. c. Substances with extremely high chemical sensitivity (such as ozone and nitrogen oxides). d. Pressure pulses caused by airflow impact, pressure shock, and cavitation lead to temperature increases that result in explosions. II. Explosion prevention measures for the main cooling system 1. Strengthen control of the quality of raw material air The oxygen production area should be located in the upwind direction throughout the year, at a distance of more than 300 meters from the acetylene generation station, and away from sources of harmful gases; strict control over the quality of the raw material air is necessary, and appropriate measures should be taken in case of severe contamination.  2. Remove harmful substances and prevent the accumulation of hydrocarbons, etc. The main factors contributing to such accumulation are as follows: a. Make full use of the liquid-air and liquid-oxygen adsorbers to remove hydrocarbons such as acetylene; strictly replace the adsorbers on schedule and control the temperature for heating and regeneration in order to improve the adsorption efficiency. b. Discharge 1% of the product liquid oxygen from the main cooler to remove hydrocarbons. c. Periodically perform thorough heating of the air separation unit to remove residual carbon dioxide and hydrocarbon impurities accumulated in the heat exchangers and distillation columns. d. For liquid oxygen pumps that operate continuously and use molecular sieves for adsorption, the adsorption efficiency for nitrous oxide is not good; a layer of 5A molecular sieve can be added inside the molecular sieve adsorber. 3. Use high-precision, state-of-the-art testing instruments to enable both online and offline monitoring. This process should be carried out regularly and in an organized manner; if the environmental conditions deteriorate, effective measures must be taken promptly to keep harmful substances within specified limits: acetylene at 0.5, methane at 120, total carbon at 155, carbon dioxide at 4, and nitrous oxide at 100 (on the order of 10-6). 4. Control of the operating liquid level A high liquid level and a large circulation ratio make it difficult for carbon dioxide and hydrocarbon compounds to accumulate and concentrate. The gas plant at Wuhan Iron and Steel Group adopts full immersion operation. After years of safe operation, all process parameters remain the same as before the adoption of this method; there is still sufficient separation space, and the heat exchange area meets the requirements. The oxygen produced does not contain any gas-liquid entrainment, so full immersion operation for primary cooling is beneficial and harmless. 5. Temporary Shutdowns and Explosion Prevention  When restarting after a temporary shutdown, it is inevitable that the system will operate at a low liquid level for a certain period of time; during this phase, hydrocarbons can accumulate locally. Additionally, when restarting, the plate heat exchanger does not function properly for some time, resulting in poor self-cleaning capabilities and carbon dioxide buildup. Combined with air flow impacts, this can lead to micro-explosions in the main cooler. Therefore, it is necessary to minimize the number of temporary shutdowns, or avoid completely draining the liquid from the system. The main cooler should be heated separately, and if possible, it should be heated thoroughly. 6. Regular cleaning: After 2 years of operation or longer, the distillation tower and liquid oxygen circulation system should be cleaned and degreased. The main cooling unit must be immersed for 8 hours; after cleaning, it should be thoroughly blown dry with air at sufficient pressure, followed by thorough heating and drying.  7. Preventing static electricity accumulation   Liquid oxygen has a high specific resistance, which makes it prone to the generation of static electricity; without grounding, static voltages of several thousand volts can be generated. Therefore, it is necessary to regularly check the grounding of air separation units. 8. Preventing oil from entering   If oil gets into the air separation unit, it will contaminate the adsorbent and affect its ability to adsorb acetylene; therefore, rotary blowers that can easily introduce oil into the air should be eliminated, and more attention should be paid to the inspection and maintenance of the expanders. 9. Strengthen the management of calcium carbide slag. The residual acetylene in calcium carbide slag causes significant air pollution, especially on rainy days; strict control is necessary, and it is best to bury it deep underground. 10. Strengthen operation, maintenance, and management. In terms of operation, careful attention must be paid to the steps involved in removing harmful impurities, such as temperature control of plate heat exchangers, stable control of the main cooling system, and monitoring of harmful substances. For maintenance, the monitoring instruments and meters must be calibrated regularly to ensure the accuracy of the test results ; Super-cycle operation should be carried out with caution; stop the machine in time for heating and purging. In terms of management, it is necessary to strictly adhere to procedural rules, strengthen equipment management, prevent illegal operations, maintain the integrity rate of equipment, and strictly implement the principle of \"not letting anything go unchecked.\" 11. Strengthen technical training to improve skill levels. Conduct regular and irregular training on an annual basis to enhance awareness of explosion prevention and improve operational skills.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.