HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Discussion on circuit debugging issues of hydrogen compressor oil system during single test run,

2008-01-25View Original

Thread Content

The single test run of the hydrogen compressor at my site is about to begin! The single test of the main motor and auxiliary oil pump and the single calibration and simulation (through DCS) test of the oil circulation, pressure gauge of the auxiliary oil system, and pressure transmitter have passed, because when the system oil pressure is 0.2MPa, the system The auxiliary oil pump will be shut down. Now the on-site director representative requires that before a single test of the hydrogen compressor (without turning on the main engine), the electrical and instrumentation must be jointly calibrated through DCS for the above actions before the test is allowed. The construction unit and owner believe that the simulation test has been done and there is no need to do it again!
Reply #22008-01-30
Testing and debugging must be carried out according to the plan and user manual. It is not just what anyone wants to do.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.