HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What size chiller is required for a 100,000-ton hydrogen peroxide plant

2008-01-31View Original

Thread Content

Dear experts: For a 100,000-ton hydrogen peroxide production plant, what size of chiller is required to condense the vent gases from the hydrogenated liquid tank, the oxidized liquid tank, and the regenerated liquid tank? The desired temperature is 5–7 degrees Celsius
Reply #22008-01-31
Is it just the cooling and condensation of the exhaust gases? A very small amount should suffice; it’s estimated that 30 m3/h of chilled water will be enough
Reply #32008-01-31
A lithium bromide unit with 2 million kilocalories of capacity is more than sufficient
Reply #42008-04-03
Could you recommend some manufacturers of refrigerators?
Reply #52008-04-10
Is the vent gas from the hydrogenation liquid tank \ oxidation liquid tank \ regeneration liquid tank condensed? How is it condensed – by using a condenser? The gases from these three tanks cannot be mixed together. This post was last edited by ytklhg on 2008-4-10 19:41]
Reply #62008-05-24
Condensers have been added to the vent ports of each storage tank.
Reply #72008-06-04
Manufacturer: Yantai Binglun; its screw refrigeration units are very well-known
Reply #82008-06-05
Dalian Iceberg, Yantai Binglun. Wu Leng has been merged into Dalian. We have products from both Dalian Bing and Yantai Binglun, but personally, I think Yantai offers better after-sales service. One type of unit available in Yantai is equipped with a Japanese Maekawa engine head, offering superior performance; however, it is necessary to specify this when placing an order.
Reply #92008-10-03
The oxidation liquid storage tanks should be equipped with condensers and activated carbon adsorption beds for venting, while the others can be vented through condensers alone. They are separate from each other. Additionally, a flame arrester must be installed for all venting systems.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.