A brief discussion on the dilemma of the plumbing profession

2008-01-31View Original

Thread Content

As one of the main majors in the design field, the piping major has always felt inferior to others. I interact with various majors the most, and the problems I solve are the most basic and practical. But I always feel that it is not taken seriously, and many people think that the technical content is not high and it is cumbersome! The treatment is also disproportionate to the actual situation! For colleagues in the piping profession, if you have any opinions, please share them! Everyone has their say! Thank you, I am a newbie, I am bold and bold!
Reply #22008-02-01
The reason for this phenomenon is that he does not understand piping. Other majors that are similar to piping are the equipment major, which overlaps with piping in terms of materials. Because it’s not very clear, I thought it was simple. But there is no need to feel inferior to others. The nature of the work determines that we have to put in a lot of effort, from the coordination of various majors to the exchange of conditions. There is not much time to sit down and work during the day. As long as we are responsible for the project and put forward our own opinions and opinions in a reasonable and well-founded way when necessary. As long as the pay is reasonable and the body can bear it, it's pretty good. :lol This post was last edited by wsts00100 on 2008-2-2 07:29 ]
Reply #32008-02-01
To outsiders, piping seems to have little technical content, and the workload is relatively large and difficult. In fact, piping also involves a lot of technical work, such as stress analysis and calculation.
Reply #42008-02-01
In fact, no matter what the major, as long as you can study it carefully, learn professionally, and have a skill, you will have a good future.
Reply #52008-02-01
I feel the same way. It’s really depressing. I’m not taken seriously and I’m treated like a inferior person.
Reply #62008-02-01
I am really lucky to have so many people in Haichuan who sincerely help me, thank you all! Leave my email: cheng10mx@sohu.com Hope to become good friends with you all
Reply #72008-02-02
Indeed, I also feel like the fifth floor. On the surface, people say that piping is very important, but in their hearts they look down on them. They all think that piping is not as professional and technical as theirs. How can it be easy for me? ! ! :(
Reply #82008-02-03
Now some design institutes only provide process drawings for small diameter pipelines during construction, and the chemical construction technicians themselves conduct piping according to the site. For large diameters, it is important for the design institute to study hard.*

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.