In some older domestic fertilizer factories, the frontline workers work on a 5-shift system; in some cases, it’s even a 6-shift system. Each shift has a large number of employees. However, in newer factories, a 4-shift system is used, and the number of employees per shift has decreased. Managers require employees to be multi-skilled, with each shift having at most 8–9 people, and in some cases up to 10. I would like to ask what kind of shift systems are in use at the factories where your friends work. Even in a 4-shift system, there are many different ways to arrange those shifts. What do you think is the most reasonable shift pattern that is best for people’s rest and health?
When I first started driving, it was a 3-shift system with 3 rotations per day, meaning 16 hours of work and 8 hours of rest. Once it starts, it’s a 4-shift, 3-day rotation system; rest time is only calculated on an hourly basis – 6 days of work followed by 48 hours of rest!
I work in Shift 4, with a 12-hour shift followed by 24 hours of rest; after working 8 shifts, I get 4.5 days off
Our company operates on a four-shift, three-day rotation system: three days of work (day shift, middle shift, or night shift, 8 hours per shift), followed by one day off.
A four-shift, three-day rotation will suffice, and it also complies with the ** eight-hour workday rule. People who work shift work often complain that they don’t have time to do this or that, and over the course of a year, all they feel is exhaustion. Of course it’s possible to work in 5-shift rotations, or even 6-shift rotations – that way there’s more personal free time and one feels less stressed. But most companies don’t do this because it increases production costs.
Our company operates on a five-shift, three-shift rotation system. However, employees on shift work work more than 180 hours per year compared to those on regular shifts. Moreover, they need additional time off, which means they actually have less free time than those on regular shifts. I think a six-shift, three-shift rotation system with time for training would be more appropriate and humane, as it would give employees on shift work the opportunity to adjust to their schedule
Oh my God, our company operates on a four-shift, three-shift system; most companies do the same. Power companies seem to operate on a five-shift, four-shift system, with each shift lasting six hours, so time passes quickly. The treatment there is good too. Some of the units here operate on a three-shift, two-cycle system. Many Japanese and Taiwanese-funded enterprises operate on a three-shift, two-shift system. I’m exhausted.
Three shifts with three rotations, with a shift available every day.
Our company operates on a three-shift system: the late night shift runs from 2 a.m. to 10 a.m., the day shift from 10 a.m. to 6 p.m., and the early night shift from 6 p.m. to 2 a.m. Each shift lasts 8 hours, with 16 hours of rest in between. I feel quite tired! ! ! However, this is closely related to the continuous production method used in chemical enterprises; it has to be that way! ! !
Our company operates on a three-shift system: the morning shift runs from 1 to 9 o’clock, the afternoon shift from 9 to 17 o’clock, and the evening shift from 17 to 1 o’clock. The shifts change every four days, with all three shifts completed over a period of twelve days; It’s still fairly okay, I know a classmate who works at a Taiwanese-owned company; they work in two shifts, 12 hours a day – it’s terrible. Among joint ventures, Taiwanese-owned ones are the worst!
Our company operates on a four-shift, three-turn system, which is the standard working pattern for most fertilizer manufacturers. How to go to work is a matter of discretion for an enterprise, as long as it complies with the relevant provisions of labor law. Whether to go to work or not is a matter of mutual choice, so there’s no need for comparison.
Four shifts per day, three consecutive days of work followed by one day off. During the equipment commissioning, two shifts are often used in rotation. Personally, I think a five-shift, three-shift system is more reasonable.
What I hear most often is that it’s a three-shift system in Team 4. We are a design company with an 8-hour workday, but I know that those who work on rotating shifts have a very tough time – their sleep patterns are irregular. Yet the responsibility for ensuring safety is extremely heavy. Here, I want to say to those who work on rotating shifts: thank you for your hard work; take care of yourselves!
The brothers who work shift work all have a hard time.
Shift 4, 3 shifts a week – it’s very exhausting. Everyone is young, and with such shifting schedules, it’s hard to find time to spend with those who don’t work shifts. Over the years, people become unrecognizable; there’s no time to be friends or to hang out together. Sigh~
Here we have a four-shift system with three shifts per day; it’s quite exhausting, and there’s very little time for rest.
We are a state-owned enterprise; currently we work in 5 shifts with a 3-shift rotation, but we plan to switch to a 5-shift system with a 2-shift rotation so that we can sleep at night
I also want to work in the five-shift system; it would be much more comfortable
Our Class 5 works in three shifts. . . . It was implemented not long ago. . . White. . Medium. . . At night, 300,000 tons of urea are stored for rest. . . . For urea, 6 to 7 people per shift
Our company operates on a four-shift, three-shift system: the night shift runs from 2 a.m. to 8 a.m., the day shift from 8 a.m. to 5 p.m., and the short night shift from 5 p.m. to 2 a.m. Previously, a five-shift, four-shift rotation system was in use, but it was abandoned due to staffing shortages! ! !