Factory first or workshop first, or workshop then factory?

2008-02-17View Original

Thread Content

I have been puzzled by this issue ever since I joined my current company. Many of the factory buildings in our company’s campus have already been built; they are just waiting for the project to start so that the workshops can be designed. However, product workshops vary in size, and the equipment available also differs. If the existing factory layout is used as is, there will definitely be areas that are not up to standard. But if we determine the product first and then build the workshop, it seems there won’t be enough time either. What are everyone’s thoughts?
Reply #22008-02-17
Under normal circumstances, the layout design of the workshop is carried out first, followed by the design of the factory building. However, for small and simple installations, standard factory buildings are often used first, after which the layout design of the installation workshop is done.
Reply #32008-02-17
Design is inherently the result of taking various factors into consideration; There are many design procedures that must be followed, but not all rules need to be adhered to at all times. For example, many projects require that existing factory buildings be reused or that old production lines be upgraded; you can’t say that all of this violates procedures. As long as the principles of economy, rationality, and safety are met and the goal is achieved, everything is fine
Reply #42008-02-17
If an old factory building is to be used, reasonable projects can only be planned based on the conditions of the building; For new projects, it is best to determine the process and equipment first, and then carry out the design and construction of the factory building accordingly; this will better meet the needs of the project itself. The accompanying lifting devices and auxiliary facilities can also satisfy the project’s requirements.
Reply #52008-02-17
A factory building is meant to be designed for workshops, isn’t it? Otherwise, what’s the use of that factory building? Not to mention factory buildings, even the design of office buildings needs to start from the perspective of the workshops; the workshop buildings are determined first, and then the office buildings. What are office buildings anyway? They don’t generate any profit.
Reply #62008-02-18
Small chemical plants often adjust their products. Most focus on workshop design. Time also comes first.
Reply #72008-02-18
In my opinion, the production process determines the construction of facilities such as factories. For those with simple and mature processes, existing equipment can be utilized, allowing the factory to be built first. However, for new or complex processes, it is better to design the factory first before constructing it, as facilities like factories are meant to support the production process in order to avoid waste. In a situation like the one described by the original poster, it is likely that your company entered into a contract with the local authorities when acquiring the land; there are requirements regarding how much investment must be made each year for building facilities, or regarding the density of buildings on the site. After all, building the factory buildings first would result in capital being tied up, and generally, business owners would not do such a thing.
Reply #82008-02-18
Our company now has two factory sites, each with 24 buildings completed. One factory site is almost used up. The workshop I’m currently designing clearly faces space constraints. It’s frustrating – the factory space is already so limited, yet the managers keep coming up with new ideas, requiring many more additions. The factory space isn’t enough; it’s not practical to put two there either
Reply #92008-02-18
First the workshop, then the factory building; if it’s an old one, there’s nothing but to arrange things according to the layout of the factory building
Reply #102008-02-18
24 factory buildings have been reserved; what is their structure? It’s a steel structure, single-story, with a steel operating platform inside; the building serves merely to provide shelter from wind and rain and keep warmth in, right? The factory structure doesn’t bear any load, does it? Is it a brick wall or a wall with sandwiched color steel panels? What is the category of production process for it? What is the fire resistance rating of the factory building? Are there any requirements regarding firewalls, blast walls, or pressure relief areas?
Reply #112008-02-18
Normally, the factory building is constructed first, followed by the workshops, as everything is planned in advance~~~ Your project must have had a design done first; the construction of the factory building and the other components of the project are all coordinated with that design!!!!!!!!!!!!!!
Reply #122008-02-18
The factory building is frame-type, with brick walls; the steel platform working surface was designed as part of the construction process. It seems like your question doesn’t have much focus or specific theme

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.