Thread Content
This post was last edited by sunjl1981 on 2013-1-6 at 23:26. Our company is about to carry out a shutdown for maintenance, and we need to develop a plan for it. Anyone who can provide relevant information would be appreciated. Thank you. Our 60,000-ton ion membrane plant has been shut down! Thank you so much! ! ! ! ! ! ! ! ! ! ! # , , &
The poster is from CHANGYI HAINENG, right? My company is also going to carry out major parking facility repairs for phases 1 and 2 next month. This post was last edited by ccedrj123 on 2008-2-19 at 14:24.]
Which unit does the brother upstairs work for?
For the parking overhaul plan, since the situations vary from factory to factory, it cannot be copied wholesale. In my opinion, the plan should include the details of the maintenance work and the timing for it. Maintenance tasks: Which equipment must be repaired during the major overhaul, is there enough staff for the repairs, and is it necessary to seek help from external parties? When will the spare parts needed for the major repair arrive? Are all the required spare parts listed, or are there any items missing? During the preparation phase, it is necessary to consider which other equipment might need repair as well. The maintenance time needs to be considered comprehensively, as accidents and other issues may arise during the process, so efforts should be made to shorten it as much as possible. The major repair should be scheduled during the off-season for sales. Before the plan is finalized, it is necessary to gather the relevant personnel for thorough discussions, analyze each piece of equipment individually, assign someone to handle each device and set a specific time frame, in order to determine the overall maintenance schedule. If there is a shortage of staff, it will be necessary to hire personnel from external companies to assist.
Not only what the experts upstairs said, but also maintenance operation tickets, tank entry operation tickets, hot work permits, construction plans, start-up and shutdown operation tickets, replacement operation tickets, and so on. In short, one must be careful, meticulous, and responsible!