An annoying thing - our company supplies products to BP, and the deliverable documents are quite troublesome. Please give me some advice!

2008-02-23View Original

Thread Content

An annoying thing - our company supplies products to BP, and the deliverable documents are quite troublesome. Please give me some advice! Our company supplies BP, and the SR delivery information is relatively complicated. The current file status is 2 "B" and 2 "C", but I don't know how to prepare it. Please friends who have prepared these materials can help me and provide me with a sample. Thank you! my email: zjl181@163.com Attached below are the SR file requirements: A0000 General A0001 List of Vendor's documents and dwgsB 2 week after POFI 2+EA0101 Process description2 week after POFR2+E2+EA0102(a)Process flow diagrams with heat and material balance2 week after POFR2+E2+EA0103 Piping & Instrument diagrams (1)2 week after POFR2+E2+EA0105 Noise data sheet 2 week after POFI 2+EA0106 Painting specification2 week after POFI 2+EA0301 Chemical, catalyst, resin specific & consumption2 week after POFR2+E2+EA0401 Vendor Data Book (VDB)2 week before deliveryFR22A0402 Final dwg electronic files2 week before deliveryFI EA0403 Equipment Data Book Index2 week after POFR22A1000 Equipment A1001 Eqpt filled-in data sheets2 week after POFR2+E2+EA1003 Calculation notes 2 week after POFI 2+EA1103 Pressure vessel construction dwgs3week after POFR2+E2+EA1112 Nameplate dwg 3 week after POFR2+E2+EA2000 Piping and Civil Works A2001 General arr.nt dwgs (1)1 week after 1 Week before deliveryFI 2+EA5002(c)Recommendations for storage prior and after erection2 Week before deliveryFI 2+EA5003(c)List of components to be erected/installed on site2 Week before deliveryFI 2+EA5004(c)List of operation to be implemented on site2 Week before deliveryFI 2+EA5006(c)List of consumables for erection,commiss. & start-up2 Week before deliveryFI 2+EA5007(c)List of spare parts for erection,commiss. & start-up2 Week before deliveryFI 2+EA5010(c)Procedure for erection and installation of the eqpt2 Week before deliveryFR2+E2+EA5015 Installation, start-up and commissioning manuals2 Week before deliveryFI 2+EA5016 Operation and maintenance manuals2 Week before deliveryFI 2+EA5017(c)Trouble shooting check list and diagrams2 Week before deliveryFI 2+EA5019(c)Procedure for test-run2 Week before deliveryFI 2+EA5021 List of spare parts for (tbd) years operation2 Week before deliveryFR2+E2+EB1000 Inspection B1002 Fabrication and quality control plan (1)45 days after POFR2+E2+EB1004 QC Manufacturing dossier45 days after POFI 3B1103 Testing procedures45 days after POFR2+E2+EB1304 Welding book (map, procedure, qualification report)45 days after POFR2+E2+EC1000 Expediting C1001 Engineering,procurement,manufacturing & test schedule2 week after POFR2+E2+EC1002 Progress report once a monthFI 2+EC1003 Sub-Vendor's and main Suppliers' list2 Week after POFI 2+EC1004 Vendor's procurement status (monthly)once a monthFI 2+EC1008 Recommendations for protection during transportation2 Week before deliveryFI 2+EC1011 Packing list 2 Week before deliveryFI 2+E This post was last edited by king163 on 2008-3-5 11:41 ]
Reply #22008-02-23
B1002 Fabrication and quality control plan (1) 45 days after PO FR 2+E 2+E B1004 QC Manufacturing dossier 45 days after PO FI 3 B1103 Testing procedures 45 days after PO FR 2+E 2+E B1304 Welding book (map, procedure, qualification report) 45 days after PO FR A5004 (c) List of operation to be implemented on site A5006 (c) List of consumables for erection,commiss. & start-up A5007 (c) List of spare parts for erection,commiss. & start-up A5010 (c) Procedure for erection and installation of the eqpt A5015 Installation, start-up and commissioning manuals A5016 Operation and maintenance manuals 2 Week before delivery A5017 (c) Trouble shooting check list and diagrams 2 Week before delivery A5019 (c) Procedure for test-run These are the parts that trouble me most at the moment, because all the documents are required to be in English, which is quite troublesome. If anyone can help me, I would be very grateful!
Reply #32008-02-23
I have sent some samples to your email! You can also help him!
Reply #42008-02-23
NOTES: (1) Priority documents subject to penalization or term of payment (2) PURPOSE: FR = Issue for review and comments / FI = Issue for information (3) QUANTITY type: Number of copies plus Electronic File (E) (4) FINAL ISSUE: Document without comments (with document status code = 3) (5) QC Manufacturing Dossier (B1004): Master Original to be checked by Inspector - One copy to be included in the Material Packing (6) ISSUE DATE: To be considered as Calendar days (7) Included in QC Manufacturing Dossier (8) To be sent to the Inspector

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.