Thread Content
How much is invested in fixed assets, what is the area occupied by the factory buildings, what is the total land area required for the project, and what about current assets? I hope everyone will participate actively and share their ideas with one another. :handshake :P :P
Our factory is about to launch a project for producing synthetic ammonia from coal on a scale of 300,000 units. We hope that the experts present at this forum can provide us with some data and information, or offer insights related to such projects for our reference. Thank you :) :)
A project with a production capacity of 300,000 tons of coal-based synthetic ammonia, covering coal storage and transportation, coal gasification, shift reaction, desulfurization, decarbonization, and ammonia synthesis. The more mature methods at present are: pressurized gasification of water-coal slurry, medium-temperature sulfur-tolerant shift reaction, low-temperature methanol washing, low-temperature liquid nitrogen washing, ammonia synthesis, and ammonia refrigeration. But you surely won’t just produce synthetic ammonia, right! What are the subsequent products? The investment for ammonia synthesis is estimated to be over 2 billion yuan. Including investments in utilities: water, electricity, gas, and steam.
Your factory can refer to the 300,000-ton project on the Wei River in Shaanxi.
Could the original poster reveal where your project is located?