HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Reboiler piping design

2008-02-26View Original

Thread Content

When I was designing the reboiler I discovered: The tubes of the reboiler and the flow direction of the oil are arranged in an equilateral triangle at the corners, while the tubes and the liquid flow direction of the general condenser are arranged in an equilateral triangle, and the position of the tie rod is also different from that of the condenser. Is there any theoretical basis for this?
Reply #22008-02-27
I can't find the reboiler piping design.
Reply #32008-06-15
Reboilers cannot be generalized. Specific problems should be analyzed in detail (type, scaling, etc.). This should be determined by the process and related to process requirements.
Reply #42013-08-16
Five and a half years have passed, has the poster found any evidence?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.