Process design flow

2008-02-26View Original

Thread Content

Let’s discuss what typically a process designer is responsible for and what the specific procedures are
Reply #22008-02-26
Not necessarily; it depends on the design institute. In our institute, process design and piping work are handled by the same person. Process design involves determining the layout of equipment and handling piping tasks, as well as requiring knowledge of other related fields.
Reply #32008-02-26
It actually depends on where – whether it’s in a design institute or elsewhere. I currently work at a company that manufactures electrolyzers; in addition to selling these devices, we also provide technical support. We need to conduct a preliminary audit of the process – the process is the key element in any project; everything else comes after that. Only once the process is determined can we proceed with aspects such as piping, instrumentation, and electrical systems. The scope of the process is quite broad; I think it covers more areas compared to piping and instrumentation. If one has a good understanding of the process, it’s possible to extend knowledge to various other areas such as instrumentation and piping equipment, but it’s more difficult otherwise.
Reply #42008-02-26
All specialties seem to need it; the order is process-system-equipment, electrical, instrumentation-layout-piping-structure, and architecture
Reply #52008-02-28
I am currently creating a single-pipe diagram for a set of equipment; the overall layout diagram is already available. What data should be included primarily in the single-pipe diagram? Should only the main pipes be drawn, most of the pipes, or all of them? Those who know please share your insights, thank you. 1
Reply #62008-02-28
I am currently creating a single-pipe diagram for a set of equipment; the overall layout diagram is already available. What data should be included primarily in the single-pipe diagram? Should only the main pipes be drawn, most of the pipes, or all of them? Those who know please share your insights, thank you. 1
Reply #72008-02-28
The original poster has raised a very good point; it’s exactly the kind of knowledge that needs to be understood.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.