Thread Content
Conditions required for the joint commissioning of the installation
Conditions for joint commissioning The purpose of joint commissioning is to verify whether the performance and quality of the equipment, pipelines, valves, electrical systems, instruments, computers, etc. in the installation meet the requirements of the design and specifications. Joint commissioning testing includes system drying, internal replacement, filling with three types of agents, water transportation, gas transportation, oil transportation, etc. Generally, it should start with a single system, and then expand to the coordinated operation of several systems or the entire installation. 1. The handover between individual projects or installations is completed ; 2. Equipment tag numbers, pipeline medium names, and flow direction indicators have been completed ; 3. The utility systems are operating steadily ; 4. The post responsibility system has been established and published ; 5. The technical personnel, team leaders, and operational staff have been identified; they have passed the examinations and obtained their work permits ; 6. The commissioning plan and relevant operating procedures have been distributed to individuals ; 7. The commissioning process parameters shall be approved and published by the production department ; 8. Interlock values and alarm values shall be approved and published by the production department ; 9. The production record forms have been printed in full and sent to the respective positions ; 10. The mechanical, electrical, and instrumentation repair areas as well as the laboratory have been put into use ; I1: The communication system is operational ; 12. The safety and hygiene measures, fire protection facilities, gas prevention equipment, as well as temperature and smoke detectors, toxic and flammable gas alarms, television surveillance systems, and protective facilities are all in good condition ; 13. The monitoring points for dust, toxins, and noise at the work sites have been identified ; 14. The logistics team has been assembled and is in place.
Could you provide an example plan for a linked test run? Thank you