Standards to be met for the equipment’s trial run
Reply #22008-02-28
Standards to be met for the commissioning with feed material: 1. The key control points for the commissioning with feed material must be reached on time, continuous operation must yield qualified products, and the commissioning with feed material must be successful in one attempt. 2. No major equipment failures, operational issues, fires, explosions, casualties, or environmental incidents occur. 3. Safety, environmental protection, fire protection, and industrial hygiene are implemented in accordance with the principle of \"simultaneous implementation,\" and the testing parameters meet the relevant standards. 4. Ensure proper material balance to minimize the consumption of raw materials, fuels, and energy. 5. Keep the commissioning costs under control for good economic efficiency.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.