HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of 40MW coal-fired boiler

2008-02-29View Original

Thread Content

I would like to ask the experts on this forum: for the lifting of the boiler drum of a 40MW coal-fired boiler (the upper boiler drum), should it be installed in one lift, or through multiple transfers? How is the alignment work for lifting it onto the boiler drum carried out? How should temporary support work be arranged?
Reply #22008-02-29
Why isn’t anyone answering? What a pity!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.