HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Pressure vessel category

2008-02-29View Original

Thread Content

Which parts of the information related to pressure vessels need to be kept?
Reply #22008-02-29
1. Product qualification certificate 2. Product quality certificate 3. General layout diagram of the finished product 4. Certificate of supervision and inspection on safety and quality in product manufacturing issued by the inspection agency of the labor department 5. Imported pressure vessels must come with a Supervision and Inspection Report on the Safety Performance of Boilers and Pressure Vessels in the People’s Republic of China, which has been reviewed and stamped by the boiler and pressure vessel safety supervision agency of the labor department at or above the provincial level.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.