How to solve the problem of excessive area of ​​dry acetylene plant?

2008-03-05View Original

Thread Content

Due to the difference between dry acetylene generation technology and wet acetylene generation, the internal building area of ​​the plant is larger. If it is spliced ​​with the acetylene purification plant, corresponding measures need to be taken, such as setting up explosion-proof walls. I would like to discuss with you how we can save this nearly 500m2 building area?
Reply #22008-03-06
It can be considered to build the production plant and the clean plant separately, and there is no need to build them together. Because the acetylene gas coming out of dry acetylene has to go through purification processes such as washing and cooling. If it enters the purification system directly, it will have an impact on the operation of the purification system.
Reply #32008-03-06
However, the distance between Class A factories needs to be 15m, so there may be problems with the general layout. If the vibrating screen can be arranged overhead, some problems can be solved.
Reply #42008-03-06
I wonder how other manufacturers arrange internal dust removal cooling towers, bucket elevators, etc.? Does any manufacturer arrange it outdoors? How to arrange it?
Reply #52008-03-07
Shandong Shouguang seems to be outside the factory, but I personally think it is not good to be outside the factory. That requires very high sealing requirements for the bucket elevator, because if the sealing is not good and it rains, there will be a big production accident.
Reply #62008-03-17
Xinlong Electrochemical was designed in Beijing, right? How could someone else’s design be bad? Hahaha:lol :lol :lol
Reply #72008-04-15
Units that use dry acetylene are best to learn from the layout of the cement production line, build on the mountain, put the crushing building on the mountain, and then parallel or slightly lift it into the generator
Reply #82008-04-18
It is best to conduct an on-site inspection of the user unit, or the technical unit to provide relevant technical data and performance pictures for other customers to choose.
Reply #92008-05-16
It is best to separate the crushing and generation. Moreover, if the bucket elevator is outdoors, the sealing problem is usually caused by sealant, which has a short service life. The details will vary depending on the north and south, east and west regions where the factory is built.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.