Project proposal for 300,000 tons/year sulfur-based sulfuric acid production

2008-04-09View Original

Thread Content

Help: I am preparing a project proposal for a 300,000 tons per year sulfur-based sulfuric acid production project.
Reply #22008-04-11
Using sulfur to produce acid is not very cost-effective at present; firstly, the price of sulfur has risen and the raw material is in short supply.
Reply #32008-04-11
**Project Name**
Proposing Unit for the Project Proposal:
Prepared by:
Date of Preparation:

Project Approval Procedure Table
Comments from the Relevant Department:
Signature of the unit proposing the project:         Date:        
Signature of the relevant professional department:         Date:        
Signature of the competent management department:         Date:        
Signature of the Deputy General Manager:         Date:        

I. Purpose and Basis for Project Construction (Song typeface, size 12, 1.5 line spacing)
1. Current situation (including processes, equipment, operating conditions, procedures, and parameters)
2. Purpose of the renovation and expected outcomes
3. Source of technology and its application in other refineries

II. Technical Solutions, Requirements, and Main Tasks for the Project (with relevant diagrams) (Song typeface, size 12, 1.5 line spacing)
1. Renovation technical plan (including a brief description of the process and diagrams)
2. Technical requirements (comparison of technical indicators before and after renovation)
3. Main tasks to be carried out

III. Investment Estimate (detailed breakdown)
1. Costs for major equipment and materials:
Serial Number | Name | Model/Specifications | Unit | Quantity | Unit Price (10,000 yuan) | Total Price (10,000 yuan) | Total
2. Project costs:
Serial Number | Amount of Work | Unit | Quantity | Unit Price (10,000 yuan) | Total Price (10,000 yuan) | Total
3. Total investment amount:

IV. Proposed Location for Construction (Song typeface, size 12, 1.5 line spacing)

V. Comments from the Planning Department (Song typeface, size 12, 1.5 line spacing)

VI. Requirements regarding the construction timeline (Song typeface, size 12, 1.5 line spacing)

VII. Predicted outcomes of project implementation (Song typeface, size 12, 1.5 line spacing)
Reply #42008-10-12
Is it a project from Sichuan? How is the project in Dazhou progressing?
Reply #52010-08-20
I have a project proposal for 600,000 tons per year.
Reply #62011-07-19
Are there any proposals for acid production projects using sulfur-rich sand? If possible, please offer your support. Thank you! Email: shlz1118@126.com

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.