Work arrangements after driving

2017-11-30View Original

Thread Content

After the equipment starts operating and enters a stable phase, for auxiliary fields such as instrumentation and electrical systems, the amount of maintenance work is much less compared to the initial commissioning phase. There is a surplus of staff, and it seems that some employees have nothing to do all day long. As a manager, how should one arrange work – by creating tasks where there are none, or by letting employees find their own things to do and things to learn?
Reply #22017-11-30
If there’s nothing to do, arrange some training activities. Managers should think of various initiatives, such as cross-device maintenance work, obtaining professional certification, or even expanding business operations to include maintenance services in other areas
Reply #32017-11-30
Then we’re not far from reducing staff to increase efficiency.
Reply #42017-11-30
It’s possible to arrange rotations for learning*, as well as to carry out routine maintenance and other tasks
Reply #52017-11-30
Once the unit is started up and operating normally, it’s a time when the team members can breathe a sigh of relief. As a manager, one must remain vigilant at this point; although the unit is running, not everyone was familiar with every section, every key instrument, or even the entire process flow beforehand. The crew on duty may feel uncertain when dealing with problems, which could lead to accidents. As a precaution, it is necessary to conduct training on the instrumentation technology of the new equipment at this stage (of course, the old procedures are no longer needed). Technicians and key personnel should explain respectively the control methods for the main instruments, the principles of interlocks, and fault handling. The team members should teach each other in order to become familiar with the locations of the main instruments and the key points regarding maintenance, so that everyone is well-informed and aware of what to do. In this way, managers can sleep soundly at night.
Reply #62017-11-30
That makes sense; it seems you’re an experienced manager.
Reply #72017-11-30
That makes sense; it seems you’re an experienced manager.
Reply #82017-11-30
That makes sense; it seems you’re an experienced manager.
Reply #92017-11-30
Not really; there are more projects, and that’s why there are more issues that arise once the projects start operating.
Reply #102017-12-01
On-site inspections of the equipment are also very important; about two such inspections need to be carried out per day. Additionally, regular maintenance and repairs are necessary, as they represent an important task for ensuring stable operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.