HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question No. 17】April 17, 2018

2018-04-17View Original

Thread Content

In explosive gas environments, when flammable materials are lighter than air, electrical circuits should preferably ( ).    A. Install at a higher elevation or directly buried.    B. Install at a lower elevation or in a cable trench.    C. Install in a cable trench; the trench should be filled with sand, and drainage facilities should be provided.    D. Install along the interior walls of the building. Summary of daily questions for B2018 Certified Electrical Engineers
Reply #22018-04-17
B. Lay at a lower level or in a cable trench
Reply #32018-04-17
  B. Lay at a lower level or in a cable trench
Reply #42018-04-17
A. Lay at a higher position or bury directly underground
Reply #52018-04-17
B. Lay at a lower level or in a cable trench
Reply #62018-04-17
B. Lay at a lower level or in a cable trench
Reply #72018-04-17
B. Lay at a lower level or in a cable trench
Reply #82018-04-17
B. Lay at a lower level or in a cable trench

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.