HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Association **Question Set 7-5

2018-07-23View Original

Thread Content

This post was last edited by 2005180005 on 2018-7-24 08:06. The answer is (4); therefore, option (3), which involves submitting process control requirements as well as data sheets for control valves and flow meters to the automation engineering team, represents conditional data sheets that are provided by the process engineering team to relevant teams – isn’t this outside the scope of work of the systems engineering team? Furthermore, the association’s revised guidelines state that the system specialists are responsible for providing data sheets related to control valves, flow meters, orifice plates, and differential pressure gauges – isn’t this contradictory?
Reply #22018-08-17
By asking this question, you’re proving that you’ve never worked in a design firm

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.