Question 15, morning of the second day, 2016

2018-09-26View Original

Thread Content

According to the book published by the Examination Board, the allowable cavitation margin is calculated as the base value plus an additional 0.3 m; then why is a margin of 0.5 m used in this question? Which one should be taken as the standard? I would appreciate some guidance from those who are more experienced.
Reply #22018-10-14
OP, could you send me a copy of the 2016 case you have via email? 504226382@qq.com Thank you, OP; you will definitely make it!
Reply #32018-10-17
15 B Hg = Hs’ – u1²/2g – Zf = 5 – 8 = -3 m; in reality, an additional reduction is needed (a value between 0.3 and 1.0 is acceptable). Here, 0.5 m is taken, so the actual installation height is -3.5 m. Both flow rate and head are independent of density and remain unchanged; therefore, this value can be used.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.