Maintenance of Texaco gasifier instruments

2008-05-27View Original

Thread Content

Please discuss which instruments are important for maintenance during the maintenance of gasifiers in various plants
Reply #22008-09-13
During major repairs, all valves and instruments must be inspected. The tasks typically carried out when switching out the furnace include replacing the thermocouples used for monitoring the temperature inside the gasification furnace; replacing any damaged thermocouples in the quenching ring as well. It is also necessary to check whether the double-flange pressure taps used for measuring the liquid levels in the gasification furnace and the carbon scrubbing tower are blocked, and whether the diaphragm boxes are damaged. Additionally, the pressure differences between the gasification furnace and the slurry pipeline, as well as between the gasification furnace and the lockhopper, need to be checked, along with the liquid levels in the lockhopper flushing water tank, in order to prevent blockages of the pressure taps due to ash and debris. Furthermore, before feeding the material, all valves involved in the gasifier interlock system must be checked to ensure that they operate properly and are in the correct position. That is, to simulate the major interlock during material feeding.
Reply #32009-06-01
During instrument maintenance, how is the interlock system maintained? 3# wwxxss_1
Reply #42009-06-01
This post was last edited by Transforming Furnace on 2009-6-1 11:26; disabling the interlock in the DCS will do. After the maintenance, have the DCS return to normal. (For operating the furnace) Some valves also require forced operation.
Reply #52009-06-06
Generally, before feeding the material, the manual valves are operated, and all the valves related to the furnace head and the overall control system are connected to the computer to be switched on and off manually once. The site staff work in coordination with those in the control room to check whether all valves have moved to their correct positions; if not, it is necessary to contact the instrumentation team immediately to address the issue. After all valves have been adjusted, the processes of “initialization,” “reset,” and “slurry operation” are carried out”; At this time, the site also needs to coordinate with the control room to verify the operation of the valves. It’s what’s known as a large chain. Large chains usually carry out this process twice to ensure the proper functioning of the valves.
Reply #62009-07-24
This post was last edited by Mobei Yihai on 2009-7-24 at 10:13. How should thermocouples in vaporization furnaces be maintained? Are there specialized technicians for fixing issues related to thermocouple sintering? Experts with experience in maintenance work in this area, please share your experiences.
Reply #72009-07-24
Broken or sintered; use rebar, and be careful not to use force, as this may damage the surrounding furnace bricks. Before parking, it is essential to perform the temperature-raising operation.
Reply #82012-01-13
Reply to 3# cheeryde: Generally, the main operator in charge of gasification works on large-scale systems, checking for any issues with these systems; if there are problems, coordination between the instrumentation team and the main operator is required to address them.
Reply #92012-01-13
The most important items are the slurry flow meter, oxygen flow rate, quench chamber, carbon scrubber tower, syngas analysis instruments, and calibration.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.