Issues with the hydrogen stripping column in Linde cryogenic gas separation?

2008-05-31View Original

Thread Content

In Linde’s cryogenic gas separation process, the feed to the hydrogen stripping column is divided into two streams: one enters at the top of the column, while the other stream is vaporized completely in a heat exchanger before entering the column. What other reasons are there besides refrigeration? Why must it be completely vaporized? I would appreciate some guidance from those with more experience, (*^__^*). I’ve just started learning about this area; if anyone has relevant materials, I hope they can share them. This post was last edited by chc1125 on 2008-10-30 14:58.]
Reply #22008-06-01
Send over your process so we can take a look together; that way it will be clearer
Reply #32010-09-19
How can it all be vaporized? The design should allow only about half of it to be vaporized, right?
Reply #42010-09-19
Create a process diagram; a simple sketch will work as well. Take a look, thanks!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.