Run a chemical plant

2008-06-10View Original

Thread Content

What **departments** need to give their approval in order to establish a chemical plant? What information is needed accordingly?
Reply #22008-06-10
It seems like you’re not explaining clearly; the field of chemistry is very broad, including light chemical industry, petrochemical industry, consumer chemicals, and so on. The approval process is also different.
Reply #32008-06-10
**Project approval, business license, work safety permit – these are just the main items; there are many other details as well that won’t be mentioned here.
Reply #42008-06-11
This post was last edited by diwu0205 on 2011-3-1 08:45. As long as there is funding, all the necessary approvals can be obtained. Wish the original poster success in starting work soon~
Reply #52008-06-11
I’m sorry for not making it clear; it’s a regular chemical coating factory
Reply #62008-06-17
General procedures: 1. Prepare a project feasibility study report, and use this report to obtain approval or registration for the project from the relevant authorities (of course, it is necessary to fill out the corresponding approval and registration forms). 2. Based on the site selected in the feasibility study report, go to the planning department to obtain a site selection approval letter, a project planning permit, and a land use permit for the construction project; 3. Conduct assessments for geological disasters and overburdened minerals on the land designated for project construction, prepare soil and water conservation plans, carry out reviews related to the simultaneous implementation of safety measures in project construction, and conduct environmental impact assessments ; 4. Prepare the materials for land pre-examination and submit them to the land administration department for approval (approval by the relevant land department is required depending on the area) ; 5. Construct the production facility in accordance with the design and construction drawings, and at the same time carry out occupational health assessments, fire safety inspections, etc ; 6. Trial production and completion acceptance ; 7. Obtain a production license (for hazardous chemicals, a license for the production and transportation of hazardous chemicals is also required) ; That’s it once the above steps are completed.
Reply #72008-06-18
Thank you to the person above; my company is currently working on a new project, and this information is very useful
Reply #82008-06-18
There should also be a safety assessment, as well as separate sections on energy conservation and fire protection. Wait
Reply #92008-06-18
Procedure for new projects: Project approval or authorization, registration -----〉 Preliminary land review -----> Land acquisition -----〉 Approved design -----〉 Construction -----〉 Commissioning for trial production -----〉 Organization of acceptance; the preliminary land review can be carried out in advance. When applying for project approval, authorization, or registration, the documents that generally need to be submitted are as follows: 1. Feasibility study report, 2. Environmental impact assessment report, 3. Report on mineral overlay, 4. Seismic report, 5. Soil and water conservation report, 6. Report on occupational disease hazards, 7. Safety assessment report, 8. Water resources assessment report, 9. Report on geological disaster risks. Depending on the scale of the project, it may not be necessary to submit all of these reports; for a detailed list of the required documents, please consult the local Development and Reform Commission. This post was last edited by zhongshan2046 on 2008-6-18 10:46.]
Reply #102008-06-18
Is a special section on energy conservation necessary? We’ve never encountered a situation where this was required; is it sufficient to just mention it in the feasibility report?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.