HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Piping and processes

2008-08-29View Original

Thread Content

I would like to ask: do everyone start by working on the piping first or on the process aspects? I work on piping, and I’m not very familiar with many of the process-related tasks; how can I make up for that?
Reply #22008-08-29
Go to the factory to train for 2 years. :hug: :D
Reply #32008-08-29
Study chemical engineering principles more, go to construction sites to learn more, and seek advice from experienced workers
Reply #42008-08-29
I’m not sure which aspect of the process is being referred to Process calculation and design are carried out in the design institute, while production operations take place in the factory. The processes in the factory are specific to petroleum; it is necessary to be familiar with the process flow, operation methods of such installations, and generally, theoretical calculations are not required.
Reply #52008-08-29
Go to the construction site more often to learn*, and ask experienced workers for advice
Reply #62008-08-29
The layout of the on-site processes aims to make rational use of space, to arrange the pathways of the pipelines in a logical manner, ensuring that everything fits together well and that the result is both aesthetically pleasing and practical. . In this regard, one can only go to the site or consult experienced people.
Reply #72008-08-29
Learn more and practice more. Over two-thirds of the work in chemical engineering design involves piping; having a foundation makes things easier, so keep improving yourself gradually~~
Reply #82008-08-29
It depends on which direction you want to pursue, but you still need to have some knowledge of the manufacturing processes
Reply #92008-08-29
Understanding the manufacturing process should be helpful for piping work; if there are issues such as collisions or space constraints in the piping, it’s better to be able to adjust the process when necessary, rather than being at a loss.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.