HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Use and Maintenance of Pressure Transmitters

2019-07-19View Original

Thread Content

Pressure transmitters are widely used in various positive and negative pressure measurements due to their advantages such as stable performance, ease of use, and high cost-performance ratio. However, when using and maintaining it, we should pay attention to the following requirements. 1. Before using instrument (1), carry out all necessary inspection and preparation work. For instruments that require filling with an isolation fluid, fill them with the appropriate fluid and make sure to remove any bubbles completely. (2) When starting the pressure transmitter, connect the power supply and preheat it for 3 minutes, then slowly open the pressure lead valve to prevent excessive pressure from rushing into the instrument and damaging the measuring elements. 2. Maintenance: (1) After 6 months to 1 year of operation, the pressure transmitter should undergo a visual inspection and routine calibration. (2) When verifying and adjusting the zero point and performing positive or negative offset adjustments, verification must be carried out at the initial measurement pressure. (3) Regularly check the zero point of instruments; metering instruments should be checked at least once a month. (4) The regular inspection cycle for the transmitter is 1 year, or it is synchronized with the maintenance cycle of the production equipment. (5) For pressure transmitters measuring condensed gases or dirty liquids, it is necessary to drain waste regularly and keep the area around the instrument clean. (6) Check that the pressure transmitter’s pressure lead pipes, valves, and connections are leak-free. (7) Regularly check the insulation and heating conditions to prevent the isolation fluid from freezing, condensing, vaporizing, etc. For more information, please visit the company’s official website at http://www.yb1518.com/. Please retain this link when reproducing the content! http://www.yb1518.com/UploadFiles/2010728142026546.jpg

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.