HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Daily Question] Registered Exam Version 2019.11.09

2019-11-09View Original

Thread Content

There is a choice of production method in the preliminary design process. There is currently a API synthesis workshop with an annual production capacity of 600 tons; the correct way of production is (). A. Continuous production B. Batch production C. Both continuous and batch production. The reference answers can be seen after responding; scoring is possible by identifying the key points. Answer: B is correct. 3 points for correctness, 1 point for error. For mass posting, the lowest score is assigned ; Replies that are unrelated to the answer are considered spam and will be deleted immediately.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.