How to prevent the flaring when starting a coking compressor

2008-10-21View Original

Thread Content

Due to energy-saving and environmental protection requirements, the company demands that the amount of rich gas emitted be well controlled when starting up or shutting down the air compressor. Operational procedures need to be improved so that gas is only released into the intake tank, rather than through overhead flares. Please share your opinions!
Reply #22008-10-21
Energy conservation is a requirement imposed on all refineries nowadays, but depending on the capacity of the gas holder, too intense venting can overwhelm it; therefore, it is necessary to contact relevant parties in advance before making any changes to the venting system
Reply #32008-10-21
At the beginning of operation, the circulation in the three desulfurization towers is stabilized; after startup, the discharge of nitrogen from the desulfurization unit is regulated. Once the enriched gas is produced, it goes directly into the absorption and stabilization system, which ensures that no flaring occurs. However, the desulfurization gases from the coking unit should not be fed into the fuel gas system first, as their nitrogen content is high, to prevent excessive nitrogen from being introduced into the system and causing hazards. We started up our coking unit without using a flare.
Reply #42008-10-21
The air compressor has been stopped – how will you handle the air in your gas tanks? ? Waiting to slowly release the torch? ?
Reply #52008-10-21
By making timely adjustments to the operations, it is possible to do without using a flare. 1. The displaced nitrogen must be released into the low-pressure system. 2. It is necessary to pay attention to the circulation volume of the compressor and the pressure regulation of the absorption stabilization system. 3. The timing of starting up the system and switching to the coke tower must be coordinated properly; increase the processing capacity only after the compressor is ready
Reply #62008-10-21
The absorption and stabilization pressure should not be set too high; this is beneficial for the integration of the air compressor and helps to reduce flare emissions
Reply #72008-10-21
The amount of gas that is sent to flaring is determined by the reutilization of compressed gas in the gas tanks and the plant’s overall gas balance capacity; otherwise, it’s the same whether the coking compressor sends gas to the gas tanks or the gas tanks send it to flaring.
Reply #82008-10-21
If the press stops suddenly, venting is inevitable; Because large amounts of rich gas will break through the water seal of the torch. It is possible to start the system normally without using a flare. First, lower the gas holder to an appropriate level, increase the amount of gas supplied to the steam boiler, and raise the water seal level in the gas holder accordingly ; When the press is started, there is a time lag; it is necessary to ensure that the gas pressure in the system does not drop too low. It should be relatively easy to achieve, as long as the scheduling and coordination are in place and there are no issues with timely communication between the relevant parties.
Reply #92008-10-21
:Loveliness: In response to the comment with 8 hugs – a sudden shutdown can also prevent the use of elevated flares; as long as it’s handled properly, there’s no problem :) I’ve carried out similar operations before; from shutdown to restart to normal operation, the elevated flare didn’t burn, and the liquid level in the gas tank rose by 7 meters. For this, our entire shift team received a bonus of over 10,000; P ;P
Reply #102011-02-20
Reply to 9# I’m ordinary, but I’m happy. May I ask the teachers on floor 9: how do you manage to operate the air compression units without using a flare? Could you explain it in detail?
Reply #112011-02-21
Is there a detailed procedure available to facilitate learning and communication among everyone? Precautions regarding the operation process, etc.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.