I am working on the completion documents for a long-distance pipeline; it’s my first time doing this, and no one has told me how to do it, nor do I know if what I’m doing is correct. Although the owner (CNOOC) provided forms for the completion documents, it did not give any instructions on how to fill them out. I suppose the completion document forms for CNPC and Sinopec are similar. Could some more experienced seniors give some advice? Thank you!
Reply #22008-11-01
For general process data, the actual measured value is what it is; of course, if it exceeds the specifications, even if it is recorded, it will still be considered unacceptable. Therefore, it must meet the specifications in order to pass. The inspection results section must be filled out in accordance with the relevant standards; it is not sufficient to simply state that the inspection was successful based on the test results. For example, in the case of pipeline pressure testing, the standards require that no leaks or deformations be detected under the test pressure, and only then can the test be considered successful – this should also be reflected in the table.
Reply #32008-11-01
Excuse me, what should be filled in the \"Construction Inspection Record for Pipeline Structures\" upstairs? Soil and water conservation, optical cables – are some of the restored drainage culverts included as well? ?
Reply #42008-11-01
What is the conveying medium? Could I use the tables from your completion documents as a reference? I don’t even have it in table form. I am preparing the completion documents for an oxygen pipeline. The requirements are quite comprehensive. Give some advice. Thank you!
Reply #52008-11-01
The forms in the completion documents come with instructions on how to fill them out; it is essential to follow these guidelines. Otherwise, no matter how well the work is done, it will affect the acceptance process. Completion documents are very important.
Reply #62008-11-01
Here as well, the technician assigned by the construction contractor left during the construction period, and someone else was brought in to handle the documentation, but that person knows nothing about it. Our owners are also pressing them; their progress is so slow.
Reply #72008-11-01
The format of completion documents is usually established and filled out in accordance with industry standards; they are in tabular form and must be approved by the owner and the supervisor.
Reply #82010-08-06
Get ready to take matters into your own hands and ensure plenty of food and resources

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.