The discussion thread on the polysilicon project initiated by Industrial Cleaning has been closed, so I have compiled the relevant project information; I still hope everyone will discuss the current status of this recent project. Due to the active contributions from everyone, there were significant differences in the information provided regarding some items; therefore, the details of those who made the relevant statements were also recorded, as there are copyright issues involved. Floor 2: Posted on 2008-8-3 08:53. This post was written by rsrm09; it relates to the 1,500 T/a polycrystalline silicon production facility at Shunda Phase I in Yangzhou, Jiangsu. Floor 3: Posted on 2008-8-3 10:49. This post is about Luoyang Zhongsi High-Tech’s 2,000 T/a polycrystalline silicon production facility; it was written by livingday. Floor 7: Posted on 2008-8-4 15:37. This post was written by Xiao Meiqiu. On July 18, 2008, Daquan Group’s Phase I polycrystalline silicon production facility with a capacity of 1,500 tons per year began operations in Wanzhou, Chongqing. Floor 10: Posted on 2008-8-10 17:42. This post was written by legend9205. Zhongsi is about to start production – 2,000 tons per year; I’m happy! Floor 12: Posted on 2008-8-13 12:56. This post was written by 5izw. It seems there’s a problem with Dahuai. This year, Yongxiang will also start producing at 1,000 t/h. Floor 13: Posted on 2008-8-13 22:58. This post was written by ybynyl. Our company is working on a polysilicon project in Baoding; it’s likely to start production next year. Floor 16: Posted on 2008-8-16 17:57. This post was written by edc_yk. What about Xuzhou Zhongneng? Weren’t things pretty chaotic lately? Floor 18: Posted on 2008-8-19 16:23. This post was written by liwenchao81. We have completed the design for the 3000t/y plant in Sichuan Yongxiang; the 200t/y plant is already in operation, while the 800t/y plant is about to be commissioned. Floor 19: Posted on 2008-8-22 10:00. This post was written by yangweich_2000. The Shenzhou Silicon Industry company in Hohhot will start operating a polycrystalline silicon plant with a capacity of 1500 tonsSerial Number | Manufacturer Name | Production Capacity (t/a) | Actual Output (t) | Polycrystalline Silicon Production Method
1 | Hemlock, USA | 7000 | 7400 | Silane method
2 | Sumitomo Titanium, Japan | 5000 | 5200 | Trichlorosilane method
3 | Wacker Chemie, Germany | 5000 | 5000 | Trichlorosilane method
4 | MEMC, Italy | 1000 | 1000 | Silane method
5 | REC, Norway (ASIMI + SGS) | 1000 | 1000 | Trichlorosilane method
6 | MEMC, USA | 3000 | 3000 | Silane method
7 | ASIMI, REC, USA | 1000 | 1000 | Trichlorosilane method
8 | Tokuyama, Japan | 1000 | 1000 | Trichlorosilane method
9 | Mitsubishi Materials, Japan | 1500 | 1500 | Trichlorosilane method
10 | Polycrystalline Materials, USA | 1500 | 1500 | Trichlorosilane method
11 | Other manufacturers | 5000 | 5000 | Mostly trichlorosilane method
12 | Total | 32000 | 32600
Floor 48: Posted on 10-06-2008 at 14:39. This article was posted by a process engineer. List of companies: Shenzhen Nanbo Group Co., Ltd., Jiangsu Zhongneng Photovoltaic Technology Development Co., Ltd., Beijing Mingcheng Optoelectronics Co., Ltd., Hebei Ningjin Jinglong Semiconductor Factory, JA Solar, Jinggong Shaoxing Solar, Tianwei Yingli Solar Co., Ltd., Zhejiang Zhongyi Solar Co., Ltd., Wuxi Shangpin Solar Company, Beijing Jingyuntong Company, Xinjiang New Energy Company, Jiangsu Shunda Semiconductor, Qinghai China Power Investment Asia Company
Floor 52: Posted on 2008-10-7 at 23:33. This article was posted by Sankeng. Wuxi Zhongcai Phase III has a production capacity of 1500 tons.
Floor 53: Posted on 2008-10-8 at 04:48. This article was posted by Ayafeng. Yichang Nanbo… But it seems there’s too much competition in this area. **Macroeconomic regulation should be implemented properly! Otherwise, we’ll end up with vicious competition based on low-level technologies!!**
Floor 59: Posted on 2008-10-11 at 02:06. This article was posted by HappyFatBoys. Luoyang Zhongsi High-Tech seems to have a production capacity of 3000 tons per year. Initially, it was said to have a capacity of 300 tons in the surrounding area; later, that capacity was increased by 700 tons. There’s also a facility with a capacity of 1000 tons being built near Luoyang High-Tech Zone – I’m not sure if that’s true. The information seems reliable.