HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the five principles of fixed-point inspections in property inspections? What system can align with the principles of inspection?

2022-06-30 View Original

Thread Content

1. Equipment determination: Identify the equipment, parts, and areas that require routine inspections. Especially in areas or locations with high risks and a tendency for safety accidents, such as important equipment rooms. 2. Set standards: Standards for determining whether the inspected areas are normal or abnormal. 3. Periodic intervals: Determine the intervals for inspections, such as every two hours, once a day, once a week, or once a month, etc. 4. Route determination: Determine the optimal inspection route that meets the requirements for inspecting all inspection items. The purpose of determining this route is to minimize blind spots during inspections. 5. Different levels of responsible persons have varying requirements regarding inspections. For example, frontline workers (the direct persons responsible for equipment management) may need to conduct inspections several times a day; team leaders may need to do so once a day; the engineering manager may require it once a week. Meanwhile, senior managers may find that conducting inspections once a month is sufficient to meet management requirements. a. Affix QR code stickers on the equipment or areas requiring inspection. Inspectors then use the XunChaShi app on their mobile devices; via QR codes, Bluetooth, or NFC, they utilize the inspection function at the equipment locations to enter relevant inspection information. b. On the computer version of the Zhongxun inspection system, administrators should click on Inspection Management – Inspection Settings – Inspection Standards. Then, they need to click “+ Add” to enter the interface for adding inspection standards, where they can fill in the relevant standards according to their actual needs. c. The inspection officer can set inspection tasks on a weekly/monthly/periodic basis (rest days and holidays can be designated, which facilitates the tracking of previous data and prevents confusion in historical records). d. Managers can access the relevant functions on the inspection officer’s computer by going to Inspection Management – Inspection Overview – Inspection Route Planning; from this interface, they can view inspection tasks, add inspection routes, and view all routes. Inspection personnel simply need to carry out inspection tasks along the inspection route, in accordance with the order of the equipment. e. Managers can set up mobile-end personnel information and team information via the computer terminal of Zhongxun Inspection, facilitating hierarchical management and preventing management chaos or unclear responsibilities. In summary, the Inspector’s Intelligent Inspection Safety Management System can align with the five fixed principles of property inspection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.

Quick Links