Jacketed container

2008-12-20View Original

Thread Content

For jacketed vessels, if the customer only makes the jacket part, the equipment tank is worn out, and there are requirements such as hydraulic pressure test on the drawing, then when the equipment is inspected by the pot inspection institute, does it have to install the made jacket in place and submit the inspection data after doing the pressure test?
Reply #22008-12-20
I think: The produced jacket must be installed in place, and the inspection data must be reported after a pressure test. Moreover, a series of inspections must be carried out on the old equipment, such as: Thickness measurement, weld inspection, etc.
Reply #32008-12-20
Is this jacketed vessel a pressure vessel? If not, there is no need to report it.
Reply #42008-12-21
Agree with 2nd floor's opinion. In some places, the jacketed vessel is not inspected by the pot inspection institute that is not a pressure vessel; in other places, it is required to be inspected.
Reply #52008-12-22
I think there are two problems. First, what you produce is a component of the pressure vessel. As long as the material and wall thickness meet the design requirements, it is fine. Second, your product goes to your next company, which is a pressure vessel production and maintenance company. They are responsible for producing pressure vessels. They combine the various parts of your pressure vessel and do the overall hydraulic pressure. If a manufacturer directly comes to you to repair their equipment, and you have pressure vessel repair qualifications, then you must make the jacket according to the original design drawings of the pressure vessel, and then make a general inspection!
Reply #62008-12-23
This is a retrofit of old equipment. 1. Check whether the use of the jacket is within the jurisdiction of the "Capacity Regulations". 2. The inner cylinder is also a pressure component (subject to external pressure). The owner needs to provide relevant information about the original product, and conduct a series of inspections before manufacturing, and check whether it can withstand the pressure (including the internal pressure of the cylinder itself and the external pressure of the jacket). 3. The modification of old equipment must be carried out by a unit with corresponding container qualifications.
Reply #72008-12-23
The category of multi-cavity pressure vessels is determined at a higher level. What should I do if the container is a pressure vessel classified into a category?
Reply #82008-12-23
This post was last edited by prt0683 on 2009-9-27 12:35. The thickness of the old shell should be measured, and the strength should be calculated. Only after passing the test can the hydraulic pressure test of the jacket be carried out.
Reply #92008-12-23
It depends on the specific conditions of your equipment, that is, whether it is a pressure vessel, and what kind of medium is used in your jacket. If the medium used is chilled water or hot water, there is no need to report it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.