To what extent is ENN Phoenix’s four-nozzle coal gasification project progressed? Can you tell us about the progress of the project?
Is ENN Phoenix also engaged in coal gasification? I’ve only been here for a short time, so I really don’t know. However, ENN New Energy Technology is working on a pilot plant that has just been successfully put into operation in November. Now it is starting to design an industrial test plant that can process hundreds of tons of coal per day. The specific technology used has not yet been determined, but it must be done by ENN’s own design institute.
Xinao Phoenix's coal gasification project is progressing very slowly. The economic crisis has occurred, there is no money, materials cannot be retrieved, and there are very few construction workers at the construction site. Which company does the poster belong to?
The economic crisis has not had a great impact on Xinao! Xinneng Chemical is still operating normally!
It is said that the new Phoenix is Texaco's technology. I'm going to go there and have a look in a while. I'll find out when I get back.
Shandong Tengzhou Phoenix Fertilizer Co., Ltd. is a comprehensive chemical enterprise controlled by Shandong Tengzhou Chenlong Energy Group. Its main products are fertilizers, chemicals, and new materials. The first phase of the large chemical fertilizer polygeneration project invested 2.29 billion yuan to build an annual output of 500,000 tons of ammonia alcohol, 500,000 tons of urea and 100,000 tons of dimethyl ether. ; The second phase of the project focuses on the production of new chemical materials as its main products ; On this basis, a third-phase project focusing on the production of high value-added products will be constructed. The project is located in the Lunan Coal Chemical High-tech Park planned by Shandong Province, Zaozhuang and Tengzhou City, covering an area of more than 600 acres. The project will give full play to the advantages of Tengzhou City's coal resources and the technical talents of Lunan Fertilizer Plant, and adopt opposed coal-water slurry gasification and new dry pulverized coal pressurized gasification technologies with independent intellectual property rights. The total project investment is expected to be 6 billion yuan, and the annual sales revenue will reach 9 billion yuan after it is fully put into production. The entire project construction period is 2 years.
The Xinao Phoenix Project is in progress and has the following characteristics:: (1) The device is enlarged, with an annual output of 360,000 tons of methanol in the first phase. (2) Use new technologies to reduce energy consumption. (3) Raw materials generally account for 35% of the cost of methanol, so cheap, easily available, local pulverized bituminous coal must be used. (4) Use domestic equipment and technology as much as possible to reduce investment and achieve a localization rate of 85%. (5) The level of technical equipment has reached the international advanced level, the comprehensive efficiency of large-scale pumps has reached more than 82%, a comprehensive balance of thermal energy has been achieved, and the automation level has been optimized and intelligently controlled based on DCS. (6) The factory is a clean and civilized factory that meets environmental protection requirements, and the emission of three wastes reaches * * Allowed emission standards.
Excuse me: Can the device be driven in 2009?
The main equipment has been completed, and the furnace construction is almost completed, but the oven conditions are not yet complete, and the piping is still a lot worse. This post was last edited by shanxg on 2009-3-18 22:16 ]