Thread Content
Some of the more valuable posts from this forum section have been categorized and compiled. It is hoped that these older posts can serve a new purpose and provide some assistance to everyone in relevant areas…… This is the first version; the categorization is rather rough. Additionally, due to time constraints, some particularly valuable posts have not yet been compiled and uploaded. They will be added gradually in future updates…… The categorization is not very detailed for now; the posts in this forum section are divided into thirteen categories. This post belongs to the sixth category: Classification Summary of Posts in the Engineering Project Management Technology Exchange Area (VI) – Engineering Design Category. The main content of this post relates to design, renovation, and expansion matters…… Unrelevant replies are not welcome. Friends who share the same interests and are willing to help with the categorization are greatly appreciated. If there are any shortcomings, please contact me via text message…… Other related classification summary posts: Classification Summary Post (I) – Engineering Project Management Category; Classification Summary Post (II) – Engineering Project Construction Affairs Category; Classification Summary Post (III) – Engineering Project Installation and Operation Category; Classification Summary Post (IV) – Engineering Project Materials and Equipment Issues Category; Classification Summary Post (V) – Engineering Project Standards and Beginner’s Guides Category; Classification Summary Post (VII) – Engineering Project Preparation and Approval Procedures Category; Classification Summary Post (VIII) – Engineering Project Handover, Inspection, and Final Settlement Category; Classification Summary Post (IX) – Engineering Project Coordination and Communication Category; Classification Summary Post (X) – Engineering Project Costs Category; Classification Summary Post (XI) – Engineering Project Safety and Quality Category; Classification Summary Post (XII) – Images Related to Engineering Project Construction, Installations, and Equipment Category; Classification Summary Post (XIII) – Types of Engineering Projects and Related Topics. This post was last edited by bingyu252 on 2009-1-31 at 20:51
1. Are there any standard requirements regarding the spacing between pumps? 2. The path of project management in design firms. 3. What are the safety operation measures to be adopted when expanding gas stations? 4. What is the difference between installation holes and lifting holes? 5. The level of detail in tiered plans. 6. I need a construction plan, an organizational design, as well as a network plan for large storage tanks. 7. If the design documents do not specify the proportion for flaw detection, how should this proportion be determined? 8. Pre-arranged holes in pipelines. 9. The meaning of elements on civil engineering drawings. 10. What is the difference between cross-section diagrams and sectional views? What does the construction drawing for No. 11 vent pipe and No. 12 include? Why can’t it be delivered all at once? 13 Is there any design or manufacturing in China of liquefied hydrocarbon spherical tanks with a capacity of 4,000 cubic meters? 14How should \"Area code\" be translated in engineering design? 15 What is a design phase? 16 Provisions regarding the division of professional tasks in large-scale standard design institutes (or rules for professional allocation), as well as regulations on professional relationships. 17 What are the requirements for the tripartite signature (by the design institute) in oil refining and chemical engineering construction projects? 18 What qualifications are required for the unit that will carry out these modifications? 19 What is the difference between basic design and preliminary design? 20 How should the foundation for a 160-cubic-meter vertical reactor be constructed? 21 What is the difference between the general construction layout and the design of the general construction plan? ? 22 How to do a good job in the construction management department of a design institute 23 On design review 24 Can standards not specified in the design documents be used? 25 What are the depth requirements for the general layout plan in the overall design? 26 Statistics on the volume of data related to pipelines; how are the coefficients for thick-walled pipelines determined? 27 How is the location of the anchor bolts for chimneys determined? 28 If I select a project, who should I hire to carry out the design work? What information do they need from me? 29 Should an 8-shaped blind flange or a valve be used at the end of the pipeline? 30 How should the size of the support legs be chosen? 31 What information is required by design firms to carry out the civil engineering foundation design for factories? 32 What is needed for a design firm to prepare a foundation design? 33 What aspects need to be carefully reviewed in construction drawings? 34 I’m having the design work done by a design firm for a project – could experts on this forum offer some advice? 35 What does a design briefing include? 36 Statistics on common problems in engineering design. 37 Responsibilities of the overall design team. 38 Key points for reviewing various types of technical drawings. 39 I’m looking for relevant standards related to the design and construction of gas pipelines. 40 What does the PID drawing include? 41 Are there any colleagues from design firms here? I’d like to ask about the design process The 42-project design is divided into several stages; what is their role? Should the single-line diagram of the 43 process pipelines be prepared by the design institute or drawn by the construction unit itself? 44 Issues related to installation and construction – how to obtain the design criteria from the construction party. 45 Request for help: Information on project planning. 46 List of enterprises with national first-class design qualifications (as of October). 47 How to determine the scale of petrochemical enterprises? 48 Risk assessment in design management. 49 Determination of the anti-corrosion grade for buried pipelines. 50 Is it complicated to prepare a project budget? This post was last edited by bingyu252 on 2009-1-31 19:53.]
51 Questions regarding the design life of projects and the design service life of equipment and pipelines. 52 Construction drawings. 53 How should pipelines be numbered? And how should welds be numbered? 54 Drawings for internal roof tanks with a capacity of 5,000 cubic meters. 55 Issues related to single-line diagrams of long-distance pipelines. 56 How should the foundation of spherical tanks be constructed? 57 At what height do straight ladders require guardrails? ? ? Question regarding the single-line diagram of the 58-long-distance pipeline; seeking advice! ! Question from 59 Design Representative: Does the DDP package provided by the design institute include the project budget? 61. Which companies in Shanghai can handle the application for Class B design qualifications in the pharmaceutical and chemical industry? 62. Double-symbol network diagrams are not very common. 63. Choices for design institutes. 64. What does a chemical engineering design institute need to design for an oxygen production system? 65. How is the height of the pump outlet determined? 66. Why are spherical tanks used instead of cylindrical tanks? 67. What to do when industry standards differ from **standards? 68 What documents are included in foreign engineering design projects? 69 Regulations on the depth of preparation for construction project design documents. 70 How are the EPC departments of large design firms? 71 How can such an institution be rapidly turned into a capable design institute? ? 72 How to Coordinate Design Changes Last edited by bingyu252 on 2009-1-31 19:54]