HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Insulation at the front end of the pressure relief valve

2009-02-02View Original

Thread Content

Our factory has a pressure reducing valve that reduces the pressure from 1MP to 20KP. However, during winter, this control valve experiences significant fluctuations in flow rate, with quite large amplitude of these fluctuations! Are there any good ways to ensure stable traffic in winter? It is now in bypass mode
Reply #22009-02-02
It is likely some kind of fuel gas such as dry gas; improving the drainage before the pressure reducing valve will yield better results.
Reply #32009-02-02
It’s useless! To improve drainage, I still choose outdoor control! It’s normal for there to be water in the wash tower at the front end of this valve; flow fluctuations don’t occur at all in summer, but this phenomenon is quite noticeable in winter! We tried to add insulation, but it didn’t work very well!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.