What procedures need to be handled locally during the installation of the device? After the installation is completed, how does one obtain a trial operation production license?
Reply #22009-02-03
Do small chemical plants necessarily require a separate section on safety facilities to pass the safety review?
Reply #32009-02-03
First, you need to conduct safety and environmental impact assessments, carry out preliminary design work, submit applications for approvals from the safety, environmental protection, and fire protection authorities, obtain permits from the construction department, get approvals from the land management department, and secure permits from the water and electricity supply agencies. In short, you have to deal with almost all **relevant departments, and it takes about half a year
Reply #42009-02-03
Adding to what was said above: a project proposal and a feasibility study report are necessary. For large-scale installations, an environmental impact assessment is also required. This post was last edited by WSL01218 on 2009-2-3 at 08:51.]
Reply #52009-02-03
It seems that it really takes a long time to build a proper device, huh?
Reply #62009-02-03
First, the project is approved and a feasibility study is conducted; followed by safety assessments and environmental impact evaluations. After that, the construction phase begins, during which a construction permit is obtained. Once construction is complete, permits for pressure pipelines and equipment inspection, as well as a permit for trial production, are obtained. Finally, a comprehensive acceptance of the entire project takes place.
Reply #72009-02-03
It takes a long time for a project to go from being conceived to actually starting construction. If you are the client, the tasks you need to carry out include preparing a project proposal, commissioning a design firm to conduct feasibility studies, carrying out safety and environmental impact assessments, then developing a preliminary design. Once the design is finalized, it must be submitted for approval by the relevant authorities in charge of safety, environmental protection, and fire safety. Permits must also be obtained from the construction department, the land management department, as well as the departments responsible for water and electricity supply, among other agencies. Only after all these approvals are obtained can a design firm be commissioned to create a detailed design, and then a construction company and workers can be hired to start the work.
Reply #82009-02-03
I am involved in the development of a project. Those upstairs have outlined everything that needs to be done, but it seems like the procedure is different from ours. The general procedure for the chemical engineering construction projects I have been involved in is as follows: project proposal → approval and submission by the project owner → site selection → project approval or registration → preliminary review of the land to be used → initial engineering geological survey → environmental impact assessment → water resource evaluation → seismic safety assessment → geological hazard risk assessment → preliminary safety assessment → preliminary assessment of occupational health hazards → feasibility study for power supply → completion of land-related procedures (including a construction land planning permit, state-owned land use certificate, etc.) → preliminary design → planning and fire safety reviews → detailed design → submission for approval → bidding → issuance of the start-up permit → commencement of construction → completion of the project → inspection of pressure vessels and pressure pipelines → environmental impact assessment upon completion → inspection of safety and occupational health facilities → inspection of fire safety facilities → issuance of a permit for trial production → trial production of the facility → final inspection and acceptance.
Reply #92009-02-03
The requirements vary slightly depending on the construction site, but generally they are as mentioned in the above paragraphs. Of course, if followed strictly according to this procedure, it may take almost two years before a project can start. In reality, many procedures in various places can be simplified or completed later; this depends on the local management and the project owner’s ability to coordinate with external parties.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.