Timing of hydrostatic testing for towers with internal components

2009-02-03View Original

Thread Content

Can a hydrostatic test be conducted after the installation of the internals in the tower and tank?
Reply #22009-02-03
It’s possible, but it also depends on the specific circumstances; for example, after all components of an ammonia synthesis tower system are assembled, a pressure test of the system is required before it can be put into operation
Reply #32009-02-04
If the internal components are not affected, it is of course possible to perform a pressure test after installation; otherwise, a pressure test must be carried out first.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.