Precautions for restarting a diaphragm cell after a long period of shutdown

2009-02-03View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 20:26. Happy New Year to everyone! Our company’s diaphragm cells (116 units, 55 KA current, type 30-III) have been shut down for about a month; they are set to be put back into operation the day after tomorrow. There are some issues we need to pay attention to – I would appreciate it if everyone could share their advice! # , , &
Reply #22009-02-05
We later discussed several points to note: First, pay attention to the outlet for chlorine gas; II. Increase the frequency of hydrogen analysis in chlorine ; III. The current must increase rapidly, reaching 30,000 amperes within 3 minutes. Make the following preparations: 1. Measure the flow rate ; 2. Replace nozzle with a larger one ; 3. Replace with saline, using warm saline ; 4. Replace the hose, increase the amount of saline added to the tank, and prepare for intubation ; 5. Open and inspect the cells with extremely high saline flow rates and a red color ; 6. Add as much brine as possible at the end of each individual cell to ensure the pressure and flow rate of the brine entering that cell ; 7. Prepare an accident response plan.
Reply #32009-02-10
The most important issue is safety; it is necessary to intensify hydrogen analysis and prepare several new tanks so that those with high hydrogen levels can be replaced at any time.
Reply #42009-02-11
A month of parking isn’t that long. When driving a vehicle, it is necessary to be prepared for grouting; for those cases where the flow rate is high and the water level cannot keep up, it is also important to analyze the hydrogen content in the chlorine ; As mentioned on the 2nd floor, the current needs to increase rapidly, usually at 5000 A per minute ; Chlorine and hydrogen analysis in the main pipeline needs to be performed every 10 minutes; pay attention to safety ; Prepare 3 to 5 new slots and install them (fit the cathode boxes) for standby use. It’s generally normal; there are no issues.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.