HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Feasibility study on compound fertilizers

2009-02-04View Original

Thread Content

I would like to ask whether a small compound fertilizer plant that is an internal investment by the company group can be streamlined according to the following points Table of Contents
1 General Introduction 1.1 Overview 1.2 Research Conclusions
2 Market Forecast 2.1 Forecast of Domestic and International Markets 2.2 Analysis and Forecast of Product Applications and Prices
3 Product Solutions and Production Scale 3.1 Selection of Product Solutions 3.2 Production Scale 3.3 Quality Specifications of Products
4 Process Technology Plan 4.1 Selection of Process Technology Plans 4.2 Process Flow and Consumption Quotas 4.3 Explanation of Automatic Control Technology Plans 4.4 Selection of Major Equipment 4.5 Standardization
5 Supply of Raw Materials, Auxiliary Materials, and Fuel 5.1 Supply of Raw Materials 5.2 Supply of Auxiliary Materials 5.3 Supply of Fuel
6 Conditions for Plant Construction and Site Selection 6.1 Conditions for Plant Construction 6.2 Site Selection Options
7 Public Utilities and Auxiliary Facilities 7.1 General Layout and Transportation 7.2 Water Supply and Drainage 7.3 Power Supply and Telecommunications 7.4 Heating and Power Supply Facilities 7.5 Ventilation 7.6 Maintenance 7.7 Central Laboratory 7.8 Civil Engineering Works
8 Environmental Protection 8.1 Geographical Environment and Natural Conditions of the Site 8.2 Environmental and Emission Standards for Project Implementation 8.3 Major Pollution Sources and Pollutants in the Construction Project 8.4 Overview of Environmental Protection and Comprehensive Utilization 8.5 Landscaping 8.6 Estimation of Environmental Protection Investments 8.7 List of Waste Discharges
9 Fire Protection 9.1 Current Fire Protection Situation of the Project 9.2 Fire Hazard Classification of the Project 9.3 Fire Protection Facilities and Measures 9.4 Labor Protection and Safety and Health
10 Project Organization, Staffing, and Personnel Training 10.1 Factory Organization 10.2 Staffing Requirements 10.3 Personnel Training
11 Project Implementation Plan 11.1 Planning of the Construction Period 11.2 Project Implementation Schedule
12 Investment Estimation and Fund Raising 12.1 Total Investment Estimation 12.2 Fund Raising
13 Financial and Economic Benefit Evaluation and Social Benefit Analysis 13.1 Estimation of Product Costs 13.2 Financial Evaluation 13.3 Social Benefit Evaluation
14 Conclusions

Appendix Diagrams:
1. General Layout Plan
2. Process Flow Diagram
3. Equipment Layout Diagram
Reply #22009-02-05
It wasn’t explained clearly; I just wanted to ask whether such a table of contents is comprehensive enough. I’ve only just started writing the content – I finished one chapter yesterday.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.