Thread Content
I’m not sure if there is any such relevant material on the forum.
Analyze each specific issue separately. What basic template do you need to use for the calculation? Are you a manufacturing factory? Design institute? Is it still the construction company?
Is the basic template a civil engineering foundation template? There are basic drawings for civil engineering formwork, which include formwork diagrams, reinforcement diagrams, etc. I’m not sure if this meets the requirements; it’s provided for reference only.
For simple templates, refer to the relevant Sinopec standards, SH3510-2000
Our basic templates are usually not included in the calculations; they are mainly used for fixing bolts. Calculations are something that falls within the scope of the structural engineering field.
The base formwork is designed based on the foundation base, the manufacturing processes, and civil engineering considerations. In fact, when designing a tower, the base formwork should be designed and manufactured first, as it needs to be delivered to the designated location for use in the civil engineering work. The manufacturing processes are taken into account during the tower design phase, and there are usually no issues with the civil engineering aspect. Ultimately, it’s mainly the responsibility of the tower design team. Of course, there are many different types of base formwork as well! It depends on the specific circumstances
In this industry, which software stands out the most to make it easier for us to learn?*