HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When can equipment be installed on steel structures

2009-02-05View Original

Thread Content

Must the equipment on the steel structure be welded completely and the bolts tightened before the equipment can be installed?
Reply #22009-02-05
According to the construction specifications: Equipment installed on steel structures must be welded first, and only after the bolts have been fully tightened can the equipment be installed; detailed instructions are available at http://bbs.hcbbs.com/thread-15115-1-29.html
Reply #32009-02-06
Yes, the specifications state it clearly
Reply #42009-03-06
In specific cases, some components may need to be welded or connected later, but the final installation should meet the requirements.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.