2009-02-06View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 20:26; two furnaces and two machines are in operation. With the electrical load remaining constant. The two turbines supply steam externally through extraction, with each bearing an electrical load of 7 MW. The boiler’s load is already at its maximum. Is it more economical to operate one steam turbine or two? # , , &
Reply #22009-02-06
The question is not precise enough: What is the compliance level for the boiler? Is the full output of a single steam turbine 7MW? It’s hard to answer.
Reply #32009-02-08
It’s necessary to see how the system operates before a reply can be given.
Reply #42009-02-09
I’m sorry. The boiler is 75 tons. The turbine is 12.5MW. The electrical load mentioned above is determined based on the operation status of the electrolyzer. Gas is also supplied externally. It is powered by a pull to supply air. There is also some gas usage within the factory, but the amount is relatively small. That’s roughly what the situation is like. Two furnaces and two machines are in operation. With the electrical load remaining constant. The two turbines supply steam externally through extraction, with each bearing an electrical load of 7 MW. The boiler’s load is already at its maximum. Is it more economical to operate one steam turbine or two?
Reply #52009-02-10
Both steam turbine generators have an output of 7MW each, with a rated output of 12.5MW for each generator. Can the electrical demands be met if only one generator is used? Clearly, the output of one generator is not sufficient to reach 14MW, so there is no issue related to cost efficiency. Another possibility is that your plant has access to external electricity as a supplement. This type of situation requires detailed analysis using various parameters, such as the parameters of your boilers, main steam conditions, turbine parameters, parameters of the first extraction steam, parameters of the second extraction steam, the demand for first extraction steam, the demand for second extraction steam, overall electricity needs, and whether there is grid electricity available as a supplement

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.