HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Collapse of the flue at the inlet of the waste heat boiler for blowing air

2009-02-06View Original

Thread Content

The refractory lining inside the flue gas path between the superheater of the blowair waste heat boiler and the boiler body has collapsed (at the top). How can this be repaired and prevented? What are the construction methods and formulas involving rammed materials?
Reply #22009-02-07
You can check this standard, which provides detailed specifications: GBJ211-87 \"Code for Construction and Acceptance of Industrial Furnace Masonry Works\"
Reply #32009-02-07
Just find a professional furnace construction company to carry out the work

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.