The first-level maintenance equipment for piston air compressors is run for 500 hours to perform first-level maintenance. Operators are the main ones, and maintenance workers cooperate. First cut off the power supply and then carry out maintenance work (see table below). Maintenance content and requirements of serial number maintenance parts: 1. Maintenance and cleaning of the equipment appearance, no rust, no yellow robe. Complete and tighten screws and nuts, and repair protective devices to ensure cleanliness, neatness, and safety. Clean oil dirt and carbon deposits from air valves at all levels. Check the spring and replace it if the rod is found to be broken or skewed. Check the valve plate and replace it if cracks, scratches or unevenness are found. Check the valve seat sealing surface. If there is any defect, repair or replace it. Check the safety valve, the action should be sensitive and reliable. Check the oil quality of the three oil pipes, oil holes, oil quality and oil quantity to meet the requirements. Clean the air filter (according to the instructions for use). If it is damaged or clogged, repair or replace it. Four electrical appliances: Clean electrical boxes and motors. The electrical installation is neat, clean and firm. Check and tighten the zero connection device. Secondary maintenance equipment runs for 3,000 hours to perform secondary maintenance, which is mainly performed by maintenance workers and operated by operators. In addition to performing the content and requirements of first-level maintenance, the following tasks should be done, and wearing parts should be mapped and spare parts proposed. First cut off the power supply and then carry out maintenance work (see table below). Serial number Maintenance parts Maintenance content and requirements: 1. External maintenance, replace the lubricant of the fuselage, and clean the inside and outside. Cleans linoleum, lint free, lint free. Clean the oil pump and related parts to ensure smooth oil passage. 2. Disassemble and clean the oil injector, repair or replace parts, and clean the oil pipe to ensure smooth flow. Disassemble the piston and piston rings of the three-cylinder cylinder and repair or replace them according to the situation. Clean the inner wall of the cylinder and the water interlayer, and check the mirror surface. If any traces are found, repair them immediately. Clean the cylinder head, packing, etc. The fourth operation is to calibrate each air pressure gauge and oil pressure gauge, which requires accuracy and sensitivity. Clean the unloading valve and check and replace wearing parts. Check and clean the pressure regulator. 5. Cooling and cleaning water tanks, coolers, cooling towers, and cooling pipes to remove scale and conduct water pressure tests. Six Electrics repairs electrical boxes, repairs electrical circuits, and repairs or replaces aging electrical components. Motor, replace grease and carbon brushes. The electrical appliances meet the requirements of equipment integrity standards. Seven performance calibration levels, inspection, adjustment, and repair accuracy. Assembly test pressure meets design requirements. After repair, the equipment will meet the standard requirements for good condition. Note: While the air compressor is undergoing secondary maintenance, internal and external inspections or tests should be conducted on the out-of-service air bins at all levels.