HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Calibration of the neutron level gauge in the coking tower

2009-02-08View Original

Thread Content

Does the neutron level gauge system in the coking tower need to be calibrated regularly?
Reply #22009-02-08
How to calibrate? I’ve never heard of it; as long as the instructions are followed, that should be fine. If anyone enters the tower during maintenance, it’s best to turn off the radiation source!
Reply #32009-02-09
It needs to be calibrated during its first use; water must be filled into the tower (for full-scale calibration). At 0% level, i.e., when the tower is empty, the level gauge manufacturer will take the initiative to contact the production unit to carry out the calibration. Otherwise, calibration will have to wait until coke is loaded into the first tower, which poses certain risks;

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.