HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Coal yard management

2009-02-08View Original

Thread Content

Our factory’s coal storage area is relatively small, resulting in severe coal mixing. When multiple suppliers’ coal needs to be unloaded at one storage location, it’s manageable when the quality of the coal is consistent; but when the quality varies, things get chaotic and it becomes difficult to ensure good quality. Let’s see what everyone is doing and how they proceed. This post was last edited by Keke on 2009-2-8 16:40.]
Reply #22009-02-08
Strengthen on-site management of coal yards and vehicle scheduling; If possible, appropriately expand the coal yard.
Reply #32009-02-08
To improve the management of the coal storage area, it is necessary to have dedicated staff assigned to each storage site; each pile of coal should be labeled. If possible, the storage area should be expanded, just as was done upstairs. Our factory’s initial coal storage capacity was 300,000 tons per year for coke production, but now it is 1.2 million tons. It’s necessary to expand the storage area further; otherwise, there won’t even be enough space to unload the trucks

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.