At 21:30 on February 9th, the gasifier of Yitai Coal-to-Oil Company was successfully started up for the first time. Congratulations!
Congratulations, I was there on the 6th as well
Congratulations to you all! I hope you can operate for a long period of time! I hope to be able to share your experiences of driving successfully!
What kind of furnace does Yitai use, and how does it operate?
What gasification technology does Yitai use? Is it in Inner Mongolia? What is the scale of the device?
Congratulations; there are not many technical issues with coal-to-oil technology. What’s crucial at present is the economic viability and operational stability. This post was last edited by shanxg on 2009-2-10 13:55]
He uses a fixed-bed reactor for vaporization; this technology is well-established. The main purpose of the project is to verify the industrial viability of the downstream Fischer-Tropsch synthesis technology. Li Yongwang posted it
Which company manufactured the gasifier? What are the parameters?
Congratulations! I hope to learn from your experience, so could you briefly share with us how it’s working?
For gasification, it’s the Northwest Research Institute; the manufacturing should be done by Jinhua Machinery
That’s not right, is it? It should be the multi-material slurry gasification technology of the Northwest Institute. It falls under the category of water-coal slurry gasification, not fixed-bed
Congratulations! Could you send some pictures of the actual product?
Congratulations! Could the poster provide details on how it operates?
Airtightness testing was carried out before the Spring Festival; material feeding was successful a few days ago, and a startup crew was hired.
Yitai is a project in Inner Mongolia! He used Texaco’s technology!
What kind of furnace is being used exactly? Those who know, please tell me exactly. Is this an iron-based slurry bed? Is Li Yongwang in charge? Is the capacity 160,000 tons? Which project at Shanxi Lu’an is also 160,000 tons? It is also a project of the Coal Chemistry Institute. Is there any connection between these two projects? If it’s just a demonstration plant, why build two similar ones? And they are all coalification institute technologies. I’m not sure if the information I have is correct; if there are any errors, please let me know if you have more knowledge about this topic.
Congratulations! I hope oil production will start soon and full capacity will be achieved.
Congratulations on a successful drive – was fuel obtained?
The Yitai coal-to-oil project is located in the Dalu Development Zone in Zhungeer Banner, Inner Mongolia. Its designed production capacity is 480,000 tons per year, with a total investment of around 4.975 billion yuan. The first phase of the project has a designed production capacity of 160,000 tons per year, requiring an investment of about 2.176 billion yuan