Does anyone have operating procedures for pressure vessels?

2009-02-09View Original

Thread Content

Does anyone have operating procedures for pressure vessels?
Reply #22009-02-10
Pressure Vessel Operating Procedures For pressure vessel operators, the safety requirements are as follows:: 1. Operators must comply with pressure vessel safety operating procedures ; . 2. Pressure vessel operators must be trained, assessed and obtained operating qualification certificates. They must understand the basic structure and main technical parameters of the pressure vessel and be familiar with the operating process conditions. ; Pressure vessel management system 1. Management scope of pressure vessels: reaction tanks, heating equipment, etc. with working pressure greater than 0.7kg/cm2 gauge pressure. Gas cylinders with working pressure greater than 1kg/cm2 gauge pressure. High-pressure ammonia storage tank with working pressure less than 15kg/cm2 gauge pressure. The above are all low voltages. 2. Implement " * * The General Administration of Labor’s Pressure Vessel Safety Supervision Regulations and the Interim Regulations on Boiler and Pressure Vessel Safety Inspection are required for maintenance, repair, use and management. 3. Pressure vessels must be inspected, pressure tested, flaw tested and deformed regularly in strict accordance with the above regulations. Supervise the correct use of pressure vessels and maintain pressure vessels in the workshop. 4. Units that use containers should formulate container safety operating procedures based on the requirements of the production process and the technical performance of the container, and strictly implement them. 5. The container must be used in strict accordance with the specified operating pressure and temperature conditions, and must not be operated under over-temperature, over-pressure or over-load. Changes in temperature and pressure control indicators must be submitted to the leadership for approval before changes can be made. 6. Units that use containers must number, register, and establish equipment files for each pressure vessel. 7. Strengthen the anti-corrosion work of containers and pipelines. The outer surfaces of containers and pipelines should be spray-painted frequently to keep the paint intact. 8. Container operators should pass training and examinations, strictly abide by safe operating procedures and job responsibility systems, and conduct regular, quantitative, and routed inspections. 9. The production technology department shall conduct comprehensive supervision on the use, maintenance, inspection and management of containers. 10. When there is pressure inside the container, no repair or tightening work is allowed on the main pressure components. 11. Containers that fall under any of the following conditions should be inspected internally and externally before being put into use, and a comprehensive inspection should be conducted if necessary. (1) The use has been discontinued for more than two years and needs to be resumed. ; (2) Disassembled and transferred from outside units to be installed and used ; (3) Changing or repairing the main structure of the container, which affects the strength ; (4) Replace the container lining. 12. The safety devices equipped with pressure vessels must be inspected regularly, and the safety accessories must be complete, sensitive and reliable, and any abnormal phenomena should be dealt with in a timely manner. 13. Abnormal phenomena occur in the pressure vessel, such as the working pressure, medium temperature or wall temperature exceeding the allowable value, and measures cannot be taken to reduce it. ; Defects such as cracks, bubbling, deformation, and leakage occur in pressure parts ; Safety attachment failure ; If the fastener is damaged and cannot operate safely, the operator has the right to take emergency measures and report it in a timely manner. Basic requirements for safe operation of pressure vessels Correct and reasonable operation and use of pressure vessels are important measures to ensure safe operation of the vessels. The basic requirements are smooth operation and prevention of overpressure, overtemperature and overloading. The safe and smooth operation of pressure vessels mainly refers to loading and unloading slowly and keeping the load relatively stable during operation. It depends on the operator's proficiency in the container's safe operating procedures and process flow, as well as the implementation of the operator's post responsibility system. Particular attention should be paid to the operating pressure and operating temperature of the container, as well as the loading, control and regulation of the liquefied gas and container. Timely discovery and accurate judgment of abnormal conditions during operation can often avoid the occurrence of major accidents or their further deterioration. In order to prevent overpressure, overtemperature and overloading of the container during operation, the following matters should be paid attention to: 1. Strictly implement safe operating procedures, ensure process operating conditions, and improve work responsibility during operation. 2. Hang safety operation signs on some key valves and operating devices, or install safety interlock devices to prevent misoperation. 3. When filling liquefied gas, strict measurement should be taken, and overfilling is strictly prohibited to prevent accidental heating. 4. Install reliable safety relief devices and overpressure alarm devices. 5. During intermittent operation and startup and shutdown in the operation process, the pressure and temperature should be as stable as possible to avoid unnecessary startup and shutdown. Pressure Furnace Safety Operating Procedures 1 Purpose is to standardize the safe operating procedures of pressure furnaces. 2 Scope This safety operating procedure applies to operators of pressure furnaces in the sintering class of the Alloy Department. 3 Responsible operators must strictly abide by this safe operating procedure. 4 Procedure 4.1 Labor protection equipment should be worn as required before operation. 4.2 Preparation before sintering 4.2.1 The pressure furnace shall be specially inspected for dyeing by the department in charge of pressure vessels every year. The high-pressure argon gas pressure gauge (especially responsible for the pressure in the furnace) and the high-pressure air inlet valve must be inspected regularly. The high-pressure air port cannot be pointed at people. The ventilation holes in the furnace should be opened at least once a month. 4.2.2 The pressure difference between the inlet and outlet of the cooling water filter must be checked every week. If it is greater than 1Kg/cm2, replace the filter element. ; The oil level of the rotary vane pump and Roots pump must be checked. If there is insufficient oil, add more oil. 4.2.3 If you want to use the dewaxing system, you need to check whether the wax discharge switch is working properly. 4.2.4 Check whether the cooling water pressure is greater than 1Bar ; Whether the high and low pressure argon gas and compressed air valves are open, whether there is enough gas, etc. 4.2.5 Check whether the heating elements in the furnace are damaged or severely deformed, and whether the hard felt insulation layer is damaged. Once found, the maintenance personnel should be notified immediately for maintenance or replacement. 4.2.6 Check whether the graphite induction box and sealing cover are burned through or cracked. If any, they need to be repaired. 4.2.7 Before loading the furnace, it is necessary to check whether the graphite roller conveyor in the furnace is damaged and whether small alloy fragments have fallen into the gaps between the rollers. Clean them if necessary to prevent damage and jamming of the rollers. 4.3 Loading operation 4.3.1 Ensure that the operating channel of the transfer trolley is unobstructed. The transfer trolley should be lowered to the lowest limit during the loading process. The stack of trays should be blocked by baffles to prevent the tray from sliding, tilting and collapsing, which may cause damage to the product. 4.3.2 When entering the furnace, the height of the trolley needs to be lowered to the same height as the ball transmission mechanism of the graphite induction box before the product can be entered or exited. 4.3.3 When loading the furnace, the dewaxing port must be covered with a suitable cover, and the dewaxing port cover must be removed after feeding. 4.3.4 When loading the furnace, the stack of material trays must be pushed onto the ball mechanism in the furnace by hand, and the first stack of products must be pushed to the limit pad at the end of the conveyor mechanism. There must be a certain distance between each stack of trays in the future to prevent the products from colliding with each other and to facilitate the insertion of iron hooks when coming out of the oven. 4.3.5 When installing the furnace, there should be a gap between the stacking tray and the induction box wall so that there is no stress between the stacking tray and the induction box wall. 4.3.6 Before closing the furnace door, check whether the spring of the insulator cover is working properly. ; The lubricant on the sealing surface of the furnace door should be evenly applied. 4.4 The furnace is working 4.4.1 After the furnace is powered on, it will automatically detect leaks and check whether the pressure difference is normal. 4.4.2 Check the cooling water system every 30 minutes. 4.4.3 In the event of a power outage during the sintering process, the auxiliary power supply generator (automatic control) should be turned on immediately to minimize equipment damage. 4.4.4 After the sintering process is completed, open the wax drain valve to drain the wax. Wax must be discharged in special leak-proof utensils. 4.5 Unloading operation 4.5.1 After the furnace door is completely opened, check the cleanliness and possible damage of the graphite plate. 4.5.2 Use iron hooks to carefully hook out the stack of trays, and use a transfer trolley to transport them to the specified place. During the transportation process, the baffle must be tightened to ensure the safety of product transportation. 4.5.3 Use a vacuum cleaner to clean the inside of the graphite box and all sealing surfaces. 4.5.4 Close the furnace door and vacuum to reduce the inhalation of oxygen in the furnace. 4.5.5 After sintering 10 times, wipe off the old lubricant and apply new lubricant. 4.6 After each operation, maintenance work must be done. 4 Responsibilities of the production and use department a. Operators must pass technical training and safety education, and pass the assessment to work with a safe operation certificate. ;   b. Strictly operate in accordance with operating procedures, and over-temperature, over-pressure, and over-load operation are strictly prohibited. ;   c. Strictly implement the patrol inspection system and promptly handle or report problems found ;   d. Carefully fill in the original position record and shift record ;   e. The out-of-service sealed and spare pressure vessels should be maintained regularly. 4.1 Safety operating procedures Enterprises should develop pressure vessel safety operating procedures (or include them in process operating procedures) based on the production process requirements and the technical performance of pressure vessels. The content should at least include:   a. Pressure vessel operating process indicators and the highest or lowest (referring to vacuum vessels) working pressure, the highest or lowest (referring to below -20°C) working temperature ;   b. Pressure vessel operating procedures and precautions ;   c. The main items and parts of the patrol inspection, possible abnormal phenomena during operation, preventive measures and troubleshooting methods ;   d. Maintenance methods for pressure vessel storage, backup and normal use.   4.2 Equipment technical files Enterprises should establish equipment technical files for pressure vessels one by one. Content should include:   a. Pressure vessel registration card (Annex 4) ;   b. Design drawings and required design, installation and (use) instructions. Medium and high pressure reaction vessels and storage vessels should have strength calculation sheets ;   c. Information related to pressure vessel manufacturing, installation and completion acceptance includes: As-built drawings, product certificates, and quality instructions.   In addition to the above documents and information, pressure vessels assembled on site should also have technical information on assembly and welding and quality inspection provided by the construction unit. ;   d. Pressure vessel pre-service inspection report ;   e. Pressure vessel periodic inspection report ;   f. Maintenance and transformation records and relevant technical documents and information ;   g. Fault records and accident reports ;   h. Regular inspection, repair and replacement records of safety accessories.   4.3 If the technical information of the pressure vessel in use is incomplete or the condition is unclear, it must be completed in time or confirmed by technical appraisal.   a. Material identification of main pressure components (chemical composition analysis, hardness measurement and metallographic inspection if necessary) and strength calculation ;   b. Whether there are defects in the base metal, internal and surface of the weld ;   c. The geometric dimensions, wall thickness, manufacturing conditions (misaligned edges, edges and corners, cylinder irregularity) and corrosion conditions of the main pressure-bearing parts.   d. For pressure vessels without drawings, at least the structural schematic diagram must be completed. ;   e. Based on the comprehensive analysis and inspection results, an identification report of the pressure vessel is obtained. The latest reply author: Mood 2008 (2008-9-07 01:29:00) General provisions for safe operation of pressure vessels 1. Pressure vessel operators must hold a "certificate" before they can operate independently. Operators should be familiar with the technical characteristics, structure, process flow, process parameters, possible accidents and preventive measures and handling methods that should be taken of the equipment and containers.   2. Before starting the operation of the equipment, the equipment should be inspected to check whether there is any abnormality in the equipment condition. ; Check whether the safety accessories and devices meet the requirements, whether there are leaks in pipe joints and valves, and check the operating parameter requirements, operating process indicators, maximum working pressure, and maximum or minimum working temperature regulations to be aware of them. When safety conditions are met. Power can start the equipment and put the container into operation.   3. When opening and stopping containers and equipment, safety technical operating procedures for the job must be strictly followed. The pressure should be slowly raised and lowered in sections and in stages, and the temperature should not be raised or lowered sharply. During work, process conditions should be strictly controlled, monitoring instruments or devices and accessories should be observed, and containers should be strictly prevented from over-temperature and over-pressure operation.   For vessels with wall temperature requirements for pressure increase, the pressure shall not be increased when the wall temperature is lower than the specified temperature. For liquefied gas containers, every time an empty tank is filled, the material filling speed must be strictly controlled to prevent brittle fracture due to low wall temperature. The filling amount must be strictly controlled to prevent explosion accidents caused by full liquid or overfilling. For flammable, explosive and toxic media, leakage and misinstallation should be prevented, the place should be well ventilated and fire prevention measures should be effective.   4. For reaction vessels with inner linings and refractory linings, the wall temperature should be checked regularly during operation or during shutdown and nitrogen filling. If in doubt, a recheck should be carried out. The materials put into the reaction each time should be weighed accurately, and the material specifications should meet the process requirements.   5. During work, patrol inspections should be carried out at regular intervals, at fixed points, on fixed routes, and on fixed items. Safety valves, pressure gauges, temperature measuring instruments, emergency shut-off devices and other safety devices should be kept complete, sensitive and reliable, and should be inspected and tested in accordance with relevant regulations in each shift. Information about inspections, inspections, and debugging should be recorded in the duty diary and equipment defect records.   6. If one of the following situations occurs, the operator has the right to take emergency measures to stop the operation of the pressure vessel and immediately report to the relevant leaders and departments:   (1) When the working pressure, working temperature or wall temperature of the container exceeds the allowable value, and various measures are taken to make it normal ;   (2) If the main pressure-bearing components of the container are cracked, damaged, deformed, or leaked, they cannot be extended to the next maintenance cycle. ;   (3) When the safety accessories or main accessories fail, the connecting end is broken, and the fasteners are damaged and it is difficult to ensure safe operation. ;   (4) When fire or other accidents directly threaten the normal operation of the container.   7. After the pressure vessel is out of service in an emergency, driving again must be approved by the supervisor and the technical director. Blind driving is not allowed without clear reasons and inadequate measures.   8. When the pressure vessel is operating or undergoing a pressure test, it is strictly prohibited to carry out any repair or fastening, disassembly, welding, etc. work on the pressure-bearing components. Safety technical specifications should be strictly followed for thermal fastening and operation debugging permitted by operating procedures.   The container operation or pressure test requires debugging. During inspection, the person's head should be kept away from the source of the accident. The inspection route should be carried out according to the determined parts.   9. When entering the container, you should do the following::   (1) To cut off the pressure source, a blind plate should be used to isolate the equipment and pipelines connected to it, and there should be obvious partition marks. It is prohibited to use valves only to replace blind plate partitions. Distribution boxes and cabinets after disconnecting the power supply should be locked and warning signs hung. ;   (2) Containers containing flammable, toxic, highly toxic or suffocating media must be replaced, neutralized, disinfected, cleaned, etc. and monitored, and sampling and analysis must be qualified ;   (3) Open all the openings and hand holes of the container to ensure that ventilation and ventilation requirements are met.   10. Out-of-use and spare containers should be maintained and inspected in accordance with relevant regulations. If necessary, the operator should drain, clean and replace it. Air compressor safety operating procedures 1. Observe the general regulations for safe handling of pressure vessels.   2. Before driving, check that all protective devices and safety accessories are in good condition, and check whether the lubricating oil levels everywhere meet the standards. You are not allowed to drive if you do not meet the requirements.   3. The inside and outside of the gas storage tank and conduit joints are inspected once a year, and all periodic inspections and hydraulic strength tests are conducted once every three years. Detailed records must be kept, and the working pressure and next inspection date must be marked on the gas storage tank. A "regular inspection certificate" must be issued by a professional inspection unit. Gas storage tanks that have not passed the regular inspection must not be used.   4. The safety valve must have a constant pressure according to the operating pressure, be pulled and inspected once per shift, perform an automatic start test once a week, calibrate the standard pressure gauge once every six months, and add a lead seal.   5. When inspecting and repairing, care should be taken to prevent wood chips, iron chips, wiping cloths, etc. from falling into the cylinder, gas tank and duct.   6. Machine parts cleaned with diesel must be operated without load for 10 minutes. Only after there are no abnormal phenomena can they be put into normal operation.   7. No repair work may be carried out while the machine is in operation or the equipment is under pressure.   8. The pressure gauge should be calibrated every year, sealed and kept in good condition. During use, if you find that the pointer cannot return to zero, the dial scale is unclear or broken, etc., you should replace it immediately. If abnormal sound, smell, vibration or malfunction occurs during operation, stop the machine immediately and wait until it is repaired before use.   9. Before starting the water-cooled air compressor, open the cooling water valve first, and then turn on the motor. When there is no cooling water or the water is cut off, the operation should be stopped. If it is a high-voltage motor, you should contact the power distribution room before starting and comply with the relevant electrical safety operating procedures.   10. Non-computer room operators are not allowed to enter the computer room. Due to work needs, they must obtain permission from relevant departments. Inflammable and explosive items are not allowed to be placed in the computer room.   11. After the work is completed, release the remaining air in the air storage tank. Cooling water should be drained in winter. Blower safety operating procedures 1. Before operation, close all dampers. Check whether the screws of each part of the equipment are tight, and whether the motor and starting switch wiring are in good condition. Whether the motor belt cover is intact and whether the anti-noise and anti-vibration measures are in good condition.   2. Before operation, idle the coupling once by hand. Turn on the power supply first, then open the damper after the motor starts. And check that the bearing and motor temperatures must not exceed 65°C.   3. It should be stable during operation. If there is a squealing sound or excessive vibration of the fan, it should be stopped for inspection.   4. After the operation is completed, cut off the power supply, close the air damper, and check whether the motor and fan parts are loose or falling off. Refrigerator safety operating procedures 1. Observe the general rules for safe operation of pressure vessels.   2. In the operating room, it is prohibited to store flammable, explosive and other dangerous chemicals, and fireworks are strictly prohibited. The valves, instruments, and safety devices used in the refrigeration system must be complete and calibrated regularly to ensure that they are always in a sensitive and accurate state. The water, oil, and ammonia pipelines must be smooth and there must be no ammonia, water, or oil leaks.   3. When the machine is running, the operator should always observe the pressure gauges, temperature gauges, ammonia liquid level, cooling water conditions, and listen to whether the machine's operating sound is normal.   4. While the machine is running, it is not allowed to wipe or touch the running parts or adjust and tighten parts that are under pressure.   5. During the operation of the machine, if a serious water shortage or special situation is found, an emergency stop should be taken. Immediately press the stop button, quickly close the high-pressure valve, then close the suction valve, throttle valve, and agitator switch. Stop the cooling water after 15 minutes, and immediately find relevant personnel for inspection and treatment.   6. The following items must be observed during ammonia filling operations::   (1) Place the ammonia bottle on a special tilting stand. When connecting the ammonia bottle nozzle to the ammonia filling pipe joint, a sealing gasket must be installed. After the connection, check whether there is any ammonia leakage. When opening or closing the ammonia bottle valve, you must first open or close the ammonia delivery main valve. Operators should stand in an appropriate position ;   (2) The ammonia filling amount should not exceed 80% of the ammonia filling volume. Pressure vessel operators should perform the following responsibilities: (1) In accordance with the operating procedures, operate and use pressure vessels correctly to ensure safe operation. (2) Carry out maintenance work on pressure vessels to keep them in good technical condition. (3) Frequently check the operation of the pressure vessel, and make timely adjustments if abnormal operating conditions are found. In case of emergency, emergency measures should be taken according to regulations and reported to the superior authority in a timely manner. (4) Any illegal command that is not conducive to the safety of pressure vessels shall be refused. Safety inspection during operation of pressure vessels The purpose of safety inspection during operation of pressure vessels: Inspection during operation of pressure vessels is an important means of dynamic monitoring of pressure vessels. Its purpose is to promptly discover abnormal conditions in operations or equipment, take corresponding measures to adjust or eliminate them, prevent the expansion and continuation of abnormal conditions, and ensure the safe operation of the container. For running containers, mainly check the following three aspects:: (1) Process conditions. Mainly check whether the operating conditions, including operating pressure, operating temperature, and liquid level, are within the range specified by safety regulations. ; Whether the chemical composition, material ratio, feeding quantity, etc. of the container's working medium, especially those components that affect the safety of the container, meet the requirements. (2) Equipment condition. Mainly check whether there are leaks or seepage at each connection part of the container ; Whether the parts and accessories of the container have plastic deformation, corrosion and other defects or suspicious signs ; Check whether the container and its connecting pipes are subject to vibration, wear, etc. (3) Safety devices. Mainly check whether safety devices and safety-related measuring instruments (such as thermometers, scales for feeding or liquefied gas filling and measuring, etc.) are in good condition. For example, is there any leakage or blockage in the pressure pipe of the pressure gauge? ; Check whether the spring of the spring-type safety valve is corroded or stuck with oil, and whether the open-air safety valve installed outdoors in winter shows signs of freezing. ; Whether these devices and appliances are within the specified permitted period of use. Patrol inspections of running containers must be carried out at regular intervals, at fixed points, and on fixed routes. When conducting patrol inspections, operators should carry inspection tools with them and carefully inspect along fixed inspection routes and checkpoints. Author: Mood 2008 (2008-9-07 01:30:14) Conditions and operating procedures for emergency stop of pressure vessels. If any of the following abnormal phenomena occur during the operation of a pressure vessel, the operator should immediately take emergency measures and report to the relevant departments of the factory in a timely manner according to the prescribed reporting procedures.: (1) The working pressure, medium temperature or wall temperature of the pressure vessel exceeds the allowable value and cannot be effectively controlled despite taking measures. ; (2) The main pressure components of the pressure vessel have cracks, bulges, deformations, leaks and other safety-threatening defects ; (3) Safety accessories fail ; (4) The pipes and fasteners are damaged, making it difficult to ensure safe operation. ; (5) Fire directly threatens the safe operation of pressure vessels ; (6) Overfilling ; (7) The liquid level of the pressure vessel is out of control and cannot be effectively controlled even after taking measures. ; (8) Severe vibration occurs in pressure vessels and pipelines, endangering safe operation. The steps for emergency stop operation are:: Quickly cut off the power supply to stop the operating equipment that transports materials into the container, such as pumps and compressors. ; Contact the relevant position to stop conveying materials into the container ; Quickly open the outlet valve to release gas or other materials in the container ; If necessary, open the vent valve to discharge the gas into the atmosphere ; For pressure vessels that are produced in a systematic and continuous manner, when emergency operation is stopped, contact with the relevant posts before and after must be done well. ; While handling emergencies, operators should immediately contact the superior authorities and relevant technical personnel in order to control the danger more effectively and avoid larger accidents. Management system for pressure vessels, instruments and instruments (1) Pressure vessels are pressure-bearing equipment with explosion risks that are widely used in industrial production and people's lives. In order to do a good job in the safety management of pressure vessels, ensure the safe operation of pressure vessels, and ensure the safety of people's lives and property, the pressure vessel management system is followed. (1) Conscientiously implement the "Interim Regulations on Safety Supervision of Boilers and Pressure Vessels" issued by the State Council and relevant safety management regulations at higher levels, organize the preparation of pressure vessel management systems, and supervise and inspect the implementation of various systems. (2) Responsible for handling the registration, renewal or scrap cancellation procedures with the boiler and pressure vessel supervision agency, and promptly reporting the situation of the relevant departments of pressure vessels or submitting written materials to the relevant superior business departments. (3) Responsible for the safe operation of pressure vessels. On-site inspections of pressure vessels should be conducted at least once a day. If signs of accidents or hidden dangers are found, they should be organized and dealt with in a timely manner and reported to the supervisor. (4) Provide regular technical training and safety education to pressure vessel operators and maintenance workers to continuously improve their sense of responsibility and technical quality. (5) Responsible for preparing regular inspection and maintenance plans for pressure vessels, organizing the formulation of technical repair plans, providing supervision opinions to the labor department, and responsible for the implementation of rectifications. (6) Participate in the investigation of pressure vessel accidents, analyze the cause of the accident, put forward handling opinions and preventive measures, and report to the higher authorities and labor department in a timely manner in accordance with the "Measures for Reporting Boiler and Pressure Vessel Accidents". Job Responsibilities of Pressure Vessel Operators (1) Pressure vessel operators must hold a "Pressure Vessel Operation Certificate" issued by the labor department before they can work alone. Without a certificate, they are not allowed to operate independently. (2) Be familiar with the technical performance of the pressure vessels you operate, and be familiar with the operating methods, so as to operate them carefully, repair them in time, and maintain them correctly. (3) Effectively implement pressure vessel operating procedures and various rules and regulations to ensure the safe and economical operation of pressure vessels, and deal with problems in a timely manner if problems are discovered ; When an abnormality in the pressure vessel is discovered that endangers safety, the company has the right to take emergency shutdown measures and report to the relevant department leaders in a timely manner. (4) Any illegal instructions that are harmful to the safe operation of pressure vessels shall be refused. (5) Strictly abide by labor discipline. Do not do anything unrelated to your job at work, do not bring children and other people into the pressure vessel room, do not leave work, do not sleep, and do not drink or chat in class. (6) Carry out patrol inspections of pressure vessels, closely monitor and adjust pressure, fill in various records carefully, pay attention to clear writing, accurate numbers, and sign responsible. (7) Always keep the pressure vessel area and equipment clean and sanitary, and conduct civilized production. (8) Study hard * Pressure vessel safety technical knowledge and continuous improvement of operating technical level. Regulations on safe operation of pressure vessels: Pressure vessels are pressure-bearing equipment with the risk of explosion. In order to properly manage the safety of pressure vessels and ensure their safe use, operators must strictly follow the regulations on safe operation. 1. Operators must hold a "Pressure Vessel Operation Certificate" issued by the labor department before they can work alone. Without a certificate, they are not allowed to operate independently. 2. Be familiar with the technical performance of the pressure vessels you operate, and be able to master the operating methods to ensure careful operation, timely repair and correct maintenance. 3. Carry out patrol inspections of pressure vessels at least once a day, closely monitor and adjust pressure, and fill in various records carefully. 4. Protect the safe and economical operation of pressure vessels, deal with problems in a timely manner if problems are discovered, and have the right to take emergency shutdown measures when any abnormalities in pressure vessels are found to endanger safety, and report to relevant department leaders in a timely manner. 5. Keep the area around the pressure vessel clean and sanitary, and conduct civilized production. 6. If the operator's work error causes personal injury or property damage, he must bear the corresponding responsibility.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.