Thread Content
Table of Contents of Three Simultaneous Management Procedures for Construction Project Safety 1. Purpose………………………………………………………………1/10 2. Scope of application……………………………………………………1/10 3. Cited documents……………………………………………………1/10 4. Definition……………………………………………………1/10 5. Responsibilities……………………………………………………1/10 6. Management content and requirements………………………………………………3/10 7. Project completion acceptance……………………………………………………5/10 8. Records……………………………………………………5/10 1 The purpose is to ensure that the construction of safety facilities in construction projects conforms to* * Relevant laws, regulations and standards must require, strengthen safety production source management, and formulate this procedure. 2 Scope of application applies to the safety management of company construction projects. 3 Cited documents 3.1 "Safety Production Law" 3.2 "Regulations on the Safety Management of Hazardous Chemicals" 3.3 "Regulations on the Safety Production Management of Construction Projects" 3.4 "Notice on Strengthening the "Three Simultaneities" Work on Safety Facilities in Construction Projects" ((Fagaitou Zi No. 1346) 3.5 3.6 "Notice on Strengthening the "Three Simultaneities" of Safety Facilities in Construction Projects in Non-Coal Mines and Petroleum, Metallurgy, Nonferrous Metals, Building Materials and Other Related Industries" (Work Safety Supervision General Manager No. 67) 3.7 "Safety Standardization Specifications for Hazardous Chemicals Business Units" 4 Definition 4.1 Construction Project: Refers to new construction, reconstruction, expansion of capital construction projects, technological transformation projects and imported construction projects. 4.2 Safety facilities “Three Simultaneities””: It means that the safety facilities in the construction project must comply with * * The prescribed standards must be designed, constructed, and put into production and use at the same time as the main project. Investment in safety facilities should be included in the construction project budget. 4.3 Safety facilities: 5 Management Responsibilities 5.1 The Chairman is responsible for approving construction projects. 5.2 The Infrastructure Section is responsible for organizing and implementing construction projects. 5.3 The Safety Department is responsible for the simultaneous management of the safety facilities of the construction project. 6 Management content and requirements 6.1 The Infrastructure Department is the department in charge of construction projects. It is responsible for organizing and implementing the project proposal, feasibility study report, preliminary design and safety facility content during the construction process and the construction of safety facilities to ensure the "three simultaneousness" of safety facilities. Construction project feasibility study reports should include labor safety and health content ; There should be a "Special Chapter on Occupational Safety and Health" in the preliminary design ; The construction of the construction project should be carried out in strict accordance with the construction drawings and design requirements. The safety facilities should be constructed at the same time as the main project and put into production and use at the same time to ensure the quality of the project. 6.2 The Safety Department is responsible for organizing and implementing the safety assessment and safety inspection of construction projects, and supervising and inspecting the implementation of the safety "three simultaneousnesses". 6.2.1 The Safety Department is responsible for organizing the safety pre-evaluation of the construction project during the feasibility study stage of the construction project, applying for the review of the safety pre-evaluation report and handling relevant procedures. 6.3 The construction project proposal and feasibility study report should strictly follow the requirements of "Citation Documents", and check and approve the establishment of necessary environmental protection, safety and health facilities by the preparation unit to prevent new pollution from the construction project. The Safety Department is responsible for the implementation of environmental assessment, safety and health assessment preparation and other matters in accordance with the annual fixed asset investment project plan 6.4 6.1.2 According to * * Regarding the requirements for the degree of environmental impact of construction projects, classified management of environmental protection of construction projects shall be implemented in accordance with the following provisions. 6.1.2.1 If a construction project may have a significant impact on the environment, an environmental impact assessment report shall be prepared to conduct a comprehensive and detailed evaluation of the pollution generated by the construction project and its impact on the environment. 6.1.2.2 If a construction project may have a slight impact on the environment, an environmental impact report form shall be prepared to conduct analysis and special evaluation of the pollution and environmental impact caused by the construction project. 6.1.2.3 If the construction project has very little impact on the environment and does not require environmental assessment, an environmental impact registration form should be filled out. 6.1.2.4 The application and approval of environmental impact reports, environmental impact report forms and environmental impact registration forms are completed during the feasibility stage of the construction project. 6.2 Approval of environmental impact reports, report forms and registration forms. 6.2.1 Requirements * * For approved construction projects, the safety department is responsible for submitting the environmental report to * * The State Environmental Protection Administration handles the approval procedures. 6.2.2 For construction projects that are subject to provincial approval, the Safety Department is responsible for submitting the environmental report to the Shandong Provincial Environmental Protection Bureau for approval. 6.2.3 For construction projects that are subject to municipal approval, the Safety Department is responsible for submitting the environmental report and report form registration form to the Municipal Environmental Protection Bureau for approval. 6.3 Management of preliminary design and construction drawing design stages 6.3.1 Safety department general * * The impact report, report form, and registration form approval documents approved by the provincial and municipal environmental protection departments are passed to the construction organization unit, and the construction organization unit entrusts the design department to prepare the preliminary design environmental protection chapter of the construction project accordingly. 6.3.2 The construction organization unit shall provide corresponding technical documents to the Safety Department before organizing the preliminary design review, and the Safety Department shall be responsible for submitting them to the relevant environmental protection departments in order to participate in the design review and be responsible for implementing the review opinions of the environmental protection chapter. 6.3.3 The design of construction drawings of construction projects should be strictly implemented in accordance with the preliminary design review opinions, and measures to prevent and control environmental pollution and ecological damage as well as environmental protection measures should be conscientiously implemented. 6.4 Management of the construction stage 6.4.1 During the construction process, the construction organization unit must strictly organize the construction according to the construction drawings, ensure the construction quality, and ensure the simultaneous completion and acceptance of environmental protection, safety and health facilities and the main facilities. The Safety Department is responsible for the supervision and management of the "Three Simultaneities" of the above-mentioned facilities. 6.4.2 The construction organization unit shall supervise the construction department to ensure civilized construction, protect the environment around the construction site, and prevent and reduce the hazards of dust, noise, and sewage pollution. After the project is completed, it is responsible for repairing and restoring the surrounding environment that was damaged during the construction process. 6.4.3 The construction organization unit and safety department shall do a good job in archiving design documents and information on environmental protection, safety and sanitation facilities, and transfer them to the archives office in a timely manner after the project is completed to ensure complete archival information. 6.5 Environmental management for trial production and completion acceptance 6.5.1 During the trial production period of the construction project, the construction organization unit must organize the design and construction units to promptly inspect and deal with problems exposed during operation, and assist the safety department in monitoring environmental protection, safety, and sanitation facilities. The above facilities must meet the requirements of the design parameters. 6.5.2 According to the entrustment of the Development Planning Department, the Safety Department shall report to the construction project within 3 months of trial production. * * The environmental protection department submits an application for environmental protection acceptance. 6.5.3 Based on * * According to the "Measures for the Management of Environmental Protection Acceptance of Completed Construction Projects", the following acceptance application materials must be submitted to the competent environmental protection department. 6.5.3.1 For construction projects that prepare environmental impact reports, submit an application report for environmental protection acceptance upon completion of the construction project, and attach an environmental impact acceptance monitoring report. 6.5.3.2 For construction projects that prepare an environmental impact report form, submit an application form for environmental protection acceptance upon completion of the construction project, and attach an environmental impact acceptance monitoring report. 6.5.3.3 For construction projects that fill in the environmental impact registration form, submit the completed environmental protection acceptance registration card for the construction project. 6.5.4 The environmental impact acceptance monitoring report must be prepared by a qualified environmental monitoring agency. 6.5.5 The safety department, construction organization unit, design and construction units participate * * At the environmental protection acceptance meeting on completion of the construction project organized by the environmental protection department, the relevant departments will respond to the questions raised by the acceptance team. 6.5.6 The construction project must pass the "Application Report for Environmental Protection Acceptance of Completed Construction Projects", the "Application Form for Environmental Protection Acceptance of Completed Construction Projects" or the "Environmental Protection Registration Card of Completed Construction Projects" approved by the environmental protection administrative department before it can be officially put into production. 6.5.7 After the construction project is put into operation, it shall be managed according to the "Environmental Protection Facilities Management Procedures". 6.5.8 Environmental protection technology transformation, new product development, and small pollution prevention and control projects shall be implemented in accordance with the above management regulations. 6.6 Safety and health evaluation shall be carried out in accordance with the current requirements for construction project approval. 7 Project Completion Acceptance After the project is completed, the construction organization unit promptly organizes and conducts acceptance in accordance with the "Implementation Rules for Completion Acceptance of Construction Projects (Projects) in Shandong Province", and the company's safety department participates in the acceptance. 8 Record Record Coding Record Name Storage Location Retention Period Project Safety Construction Contract Safety Section 3 Years Project Completion Acceptance Registration Project Management Department Long-term Appendix 1: serial number: Engineering Project Safety Construction Contract NO. Engineering Project Safety Construction Contract NO. In order to do a good job in the construction safety of the engineering project, reduce the occurrence of casualties and accidents, and achieve safe and civilized construction, this safety construction contract has been formulated through joint negotiation between the project management unit, the property owner unit and the construction unit, and the obligations assumed will be conscientiously performed. In the event of an accident involving casualties, the relevant personnel and units will be held accountable in accordance with regulations, and financial penalties will be imposed. Project name Construction unit Start time Completion time Year month day Year month day Main work items: In order to achieve safe construction, the project property owner should provide the following guarantee conditions: (The engineering project supervisory unit has the following safety requirements for the project construction unit:: (Project supervisory unit to construction unit) Project management unit (official seal) Year, month, day Measures to ensure safe construction of this project: Project property rights unit (official seal) Year, month, day Safety construction measures: Project construction unit (official seal) Year, month, day 1. This contract is signed in quadruplicate by the project management unit. It must be signed before the start of construction. It shall be sent to the safety supervision department for review and seal and then returned to each unit. 2. The leaders of all relevant units involved in this contract are responsible for the performance of all terms in the contract. 3. The safety supervision department shall supervise and inspect the execution of the contract in accordance with relevant regulations, and provide rewards and punishments. 4. All competent departments involved in outsourced projects must approve construction only after signing the contract. Safety Supervision (Official Seal) Year Month Day Appendix 2 Project Completion Acceptance Registration Number Project Name Year Month Date Acceptance Content Remarks Acceptance Unit