Addition of piping acceleration loads

2009-02-11View Original

Thread Content

When the machine is in operation, there are acceleration loads of 1g, 0.8g, and 1.5g in the X, Y, and Z directions respectively – how should these be added? Can it only be converted by adding an average unloading load? Could someone please give some advice? Thank you :) This post was last edited by wcz_luke on 2009-2-11 at 11:02.]
Reply #22009-02-11
I’m seeing the question you asked for the first time; Quite interested ; Processing...
Reply #32009-02-11
It’s my first time using CAESAR for pipeline analysis; I’m trying things out as I go, so I hope experts can offer me a lot of guidance!
Reply #42009-02-11
On the editing page, select the \"Special Execution Options\" button. In the pop-up dialog box, check the \"Uniform Loads in G’s\" option (this option is unchecked by default), then return to the editing page. After selecting \"Uniform Loads\", you will be prompted to enter the three-dimensional acceleration values

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.